My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008376
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:45:25 AM
Creation date
5/18/2020 11:27:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008376
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Problem Assessment Report Page 16 <br /> Ranch Market,23569 South Santa Fe Road,Riverbank,CA November 8 2000 <br /> applied vacuums of 20 to 30 in H2O Depending on the available power supply at the Ranch <br /> Market, a soil vapor extraction air sparge system should have the following specifications <br /> Catalytic Oxidizer Flow rate of 300 to 500 scfm at 75 to 100 inches of water <br /> A total of 10 SVE wells with extraction rates of 30 to 50 scfm <br /> Air Sparge Blower Positive displacement blower rated for 140 scfm at 10 psi <br /> A total of 7 AS wells with individual infection rates of 20 scfm <br />' The treatment compound will have a concrete slab, be 15 feet wide and 20 feet long, and be <br /> surrounded with an 8-foot tall chain-link with sound blankets The location of compound, <br />' existing SVE and AS wells, and lateral piping layout are presented in Figure 11 <br />' 10.0 CORRECTIVE ACTION IMPLEMENATION <br /> With approval of conceptual remedial design by the RWQCB, corrective action will be <br />' implemented following the steps described below <br /> 10.1 Final Remedial System Design <br />' Aacka e of construction design drawings will be prepared for the recommended remedial <br /> p g � <br /> method The package will include location drawings for the existing and proposed <br />' remediation wells, conveyance trenches, utility connections, and the treatment system <br /> compound Specified construction details (trench and piping details, wellhead details, <br />' instrumentation diagrams, etc ) will also be illustrated <br /> A construction bid package will be prepared, including the design drawings, technical <br />' specifications, and general construction conditions to describe the type and extent of <br /> construction activities to be performed The technical specifications will address details of <br /> the design not included in the design drawings, including the methods, engineering standards, <br />' and materials which must be used by the contractor during construction The general <br /> conditions will present contractual language regarding the requirements Specifications for <br /> extraction and treatment process equipment will be prepared to aid procurement of the <br />' equipment <br /> 10.2 Permitting <br /> All necessary permits for system construction and operation shall be obtained prior to system <br /> installation Based on the selected remedial methods, the following construction and <br />' operating permits may be required for the proposed system <br /> • SJCEHD well installation permits <br />' • Building and electrical permits from the County and/or City Building Departments, <br /> 1 <br /> File PAR-report doc SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.