My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008376
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:45:25 AM
Creation date
5/18/2020 11:27:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008376
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Problem Assessment Report Page 18 <br /> Ranch Market,23569 South Santa Fe Road,Riverbank,CA November 8 2000 <br /> 10.5 Remediation System Troubleshooting and Start-up <br />' Upon completion of system construction, the system will be operated to verify the correct <br /> operation of all process equipment and controls and to troubleshoot and repair any component <br /> of the system not operating correctly Once the system is fully operable, official startup will <br />' be performed The system may be monitored and sampled according to the conditions of each <br /> of the system operating permits Data from the startup will be tabulated as necessary to <br /> prepare a report, or reports, to fulfill start-up reporting requirements of each permit <br /> 1 10.6 Remediation System Operation & Maintenance, Monitoring, and Reporting <br />' An operation and maintenance (O&M) manual will be prepared as a stand-alone document to <br /> assist personnel maintaining the operation and performing compliance monitoring of the <br /> remediation system The system manual will include as-built drawings, monitoring and <br />' maintenance checklists and schedules, troubleshooting guides, and equipment operating <br /> manuals The remediation system will be operated until cleanup goals are achieved or until <br /> such a time as the remediation effort is shown to no longer be technically or economically <br />' feasible such as when groundwater concentrations reach asymptotic levels Site clean-up <br /> goals may eventually be determined by risk based corrective action assessment Throughout <br /> the life of the system, its operation will be monitored, at a minimum, to verify permit <br />' compliance and to meet permit reporting requirements Site groundwater monitoring and <br /> sampling will continue to be performed on a quarterly basis Groundwater monitoring and <br /> system efficiency reports will be prepared and submitted on a quarterly basis <br /> System efficiency reporting will include summaries of mass extracted, mass extraction rates, <br />' and any modifications to system operation which may have increased mass extraction rates <br /> Extracted mass will be compared to the estimated mass of hydrocarbons in soil and <br /> groundwater prior to remediation and groundwater concentrations will be compared to <br />' groundwater cleanup goals to evaluate the progress toward remediation of the Site <br /> RWQCB will be asked to review the results of the efficiency reports to continually assess the <br />' applicability of site cleanup goals These results will also be used to determine the need for <br /> Site closure activities <br /> I <br /> File PAR-report doe SECOR International <br /> P Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.