Laserfiche WebLink
r <br /> Work Plan For Well Installation and Feasibility Testing 5 <br /> Ranch Market Site,23569 South Santa Fe Road Riverbank,California September 13 2000 <br /> • Contaminant concentration in extracted vapor stream using a flame ionization detector <br /> (FID) at the air treatment inlet (pre-dilution) approximately every 30 minutes and <br /> contaminant concentrations in the air treatment outlet port approximately every 60 <br /> minutes, <br /> • Lower explosive levels (LELs) in extracted vapor stream using an LEL meter at the air <br /> treatment inlet (pre-dilution) approximately every 60 minutes, and, <br /> • Vapor samples will be collected from the extracted vapor prior to the air treatment inlet <br /> (pre-dilution) prior to termination of each of the four vapor extraction tests presented <br /> below, <br /> • The samples will be submitted to a California-certified laboratory for the analysis of <br /> TPHg, BTEX, and MTBE by EPA Method 8260B <br /> . A total of four separate soil vapor extraction tests are detailed below <br /> S VE Test#1 3 hour Vapor Extraction Test Using Well V-2 <br /> Induced Vacuum Monitoring Points- V-4 distance from V-2 is 10 feet <br /> V-3 distance from V-2 is 15 feet <br /> V-1 distance from V-2 is 20 feet <br /> V-5 distance from V-2 is 24 feet <br /> V-6 distance from V-2 is 40 feet <br /> The Extraction flow rate and influent FID readings will be collected from V-2 every 15 <br /> to 30 minutes One influent soil vapor sample, VE-V-2, will be collected prior to <br /> termination of the test <br /> SVE Test#2 3 hour Vapor Extraction Test Using Well V-1 <br /> Induced Vacuum Monitoring Points- V-5 and V-2 distance from V-1 is 20 feet <br /> V-4 distance from V-1 is 25 feet <br /> V-6 distance from V-1 is 30 feet <br /> V-3 distance from V-1 is 35 feet <br /> 51e Rwt h MwketlReponslRb-Wellinstal FrasibtLtyl WICP wpd <br />