My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
14700
>
2900 - Site Mitigation Program
>
PR0542399
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:17:17 PM
Creation date
5/18/2020 2:15:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542399
PE
2960
FACILITY_ID
FA0024361
FACILITY_NAME
OWENS-BROCKWAY GLASS CONTAINER INC
STREET_NUMBER
14700
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
209240024
CURRENT_STATUS
01
SITE_LOCATION
14700 SCHULTE RD
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br /> MONITORING AND REPORTING PROGRAM ORDER NO. -2- <br /> OWENS-BROCKWAY AND OWENS-ILLINOIS <br /> GLASS FURNACE FACILITY <br /> SAN JOAQUIN COUNTY <br /> Parameter Units Type of Measurement Inspection Frequency <br /> Sludge depth and scum thickness Feet Staff Gauge Annually(by April _ <br /> in each compartment of each septic tank. - of each year) <br /> Distance between bottom of scum Inches Staff gauge Annually(by April <br /> layer and bottom of outlet device. of each year) <br /> Distance between top of sludge layer Inches Staff gauge Annually(by April <br /> and bottom of outlet device. of each year) <br /> Septic tanks shall be pumped when any one of the following conditions exist or may occur before the <br /> next inspection: <br /> a. The combined thickness of sludge and scum exceeds one-third of the tank depth of the first <br /> compartment: or, <br /> b. The scum layer is within three inches of the outlet device; or, <br /> c. The sludge layer is within eight inches of the outlet device. <br /> In lieu of septic tank measuring, the septic tanks may be pumped annually. <br /> LEACHFIELD MONITORING <br /> Both domestic wastewater systems.will be visually monitored. Leachfield monitoring will consist of <br /> visual inspection of the leachfield and nearby area. The leachfield and the area downslope of the <br /> leachfield shall be inspected on a monthly basis for the presence of wet areas, leachate or groundwater <br /> seepage, objectionable odors, and/or unexpected plant growth. Leachfield monitoring results shall be <br /> included with all monthly monitoring reports. <br /> PROCESS WASTEWATER EVAPORATION/PERCOLATION PONDS <br /> 11 <br /> Samples shall be collected from an established sampling station located in an area which will provide a <br /> sample representative of the wastewater in Pond No. 1. Freeboard monitoring shall be performed at all <br /> ponds. Freeboard will be measured vertically from the surface of the pond water to the lowest <br /> elevation of the surrounding berm. Holding pond monitoring shall include at least the following: <br /> Sample Sampling Reporting <br /> Constituent Units Type Frequency Frequency <br /> Flow Gallons Metered Continuous Monthly <br /> Freeboard Feet Measurement Monthly Monthly <br /> BODS mg/1 Grab Monthly Monthly <br /> Volatile Organic Compounds2 µg/1 Grab Monthly Monthly <br /> TPH—Diesel (EPA Method 8015-m) mg/l Grab Monthly Monthly <br /> Free Petroleum Product Inches Measurement Monthly Monthly <br /> pH pH units grab Monthly Monthly <br /> Specific Conductivity µmhos/cm grab Monthly Monthly <br /> Standard Minerals' mg/1 Grab Annual Annual <br />
The URL can be used to link to this page
Your browser does not support the video tag.