• w <br /> slowly dropping the material through a tremie pipe from the surface. Frequent measurements will be <br /> made to reduce unrecognized bridging of the sand pack. The hollow stem auger will be gradually <br /> removed from the borehole as the sand packing progresses. The sand pack material will extend along <br /> the length of the perforated section to no more than 2 feet above the top of the screen. <br /> A minimum two-foot thick seal of bentonite pellets will then be placed on top of the filter pack and <br /> allowed to hydrate.The pellets will be hydrated by pouring deionized water into the annular space. <br /> The grout seal will then be mixed and pumped through a tremie pipe into the annular space. The <br /> hollow auger will be gradually removed from the borehole as the grouting operation progresses. <br /> MW-5R will be completed at the surface using a traffic-rated well cover. The well cover will be <br /> installed approximately'/4-inch above grade to reduce the entry of surface waters and fixed in place <br /> with concrete. <br /> Task 4-Monitoring Well Development <br /> The well will be developed to reduce the effects of drilling on the formation and to increase the <br /> effective hydraulic radius of the well. <br /> Monitoring wells are generally developed 24 to 48 hours after installation to allow the grout to set. <br /> The well will be developed by surging,pumping,or bailing. Surging along the screened interval of the <br /> well is performed to draw the sediment from the formation into the filter pack and the well and to set <br /> the sand pack.The sediment-laden water will be purged from the well at a rate of between 0.75 to 10 <br /> gallons per minute(gpm)depending on recharge rate.Development will continue until the discharge <br /> runs relatively clear of fines.Approximately 5 to 10 well volumes will be removed from the <br /> monitoring well.Because MW-5R is an upgradient well and not affected by site activities,the <br /> development water will be discharged directly to the ground. <br /> Task 5-Well Survey <br /> The elevation of the top of the PVC casings will be surveyed and tied into permanent markers, if <br /> readily available. Survey accuracy will .01 foot <br /> Task 6—Well Installation Report <br /> CKG will prepare a brief Groundwater Well Installation Report. This report will document the <br /> well drilling activities, boring log, well construction details and well development. CKG will <br /> also prepare and submit the California Department of Water Resources Well Construction <br /> Report. <br /> After the well installation is completed the well will be incorporated into the existing <br /> groundwater monitoring program. <br /> CKG Environmental,Inc. Page 3 November 3,2017 <br /> Well Installation Work Plan Owens-Brockway Tracy CA <br />