Laserfiche WebLink
l ` 5.0 FINAL PROJECT REPORT <br /> At the conclusion of the project, a final report will be compiled <br /> f to document the general field operations as well as the handling <br /> and disposition of the excavated soils. In addition, the final <br /> report will discuss the sample analysis as well as the pump test <br /> ` results. <br /> 6.0 IMPLEMENTATION SCHEDULE { <br /> Upon receipt of the Regulatory Agency approval for this Final <br /> Remedial Plan, WESTON will require 10 working days to mobilize. <br /> .�. once mobilized, the initial excavation will be completed within <br /> 1 five days and the entire excavation, should it extend to the <br /> maximum extent, will require 15 working days. <br /> Upon completion of the excavation, 20 working days will be <br /> required to complete the final report for submittal. <br /> t <br /> •k�J <br /> 1 <br /> i <br /> ,i <br /> i <br /> x � t <br /> i <br /> 9 <br /> ig <br />