My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012626
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
ARCHIVED REPORTS_XR0012626
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:03:14 PM
Creation date
5/18/2020 2:45:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012626
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NMI <br /> Laurie Cotulla <br /> May 15, 1986 <br /> Page 4 <br /> 3. The pumped free product is to be contained in a 500 gallon <br /> surface storage tank approved for the containment of flam- <br /> mable .liquids (Class IA). The permitting process has been <br /> initiated through the San Joaquin County Building and Fire <br /> Prevention Departments. The Air Pollution Control District <br /> has been contacted to obtain required permitting for the <br /> storage tank vent and discharge from an air stripper. <br /> 4. The water recovery system control panels, water treatment <br /> system, product storage tank will be enclosed in a fenced <br /> compound. The exact location of the compound has not been <br /> determined but will likely be constructed between or behind <br /> the existing buildings on the property. The recovery tank <br /> will be placed within a concrete double containment structure <br /> (See Figure 2) . <br /> 3 <br /> i <br /> 5. The option of using the 4 inch well GT--2 as an additional <br /> pumping well may be exercised to expedite the clean up <br /> operation. The pumped groundwater from this well would be <br /> processed through the carbon filtration system prior to <br /> discharge. <br /> 6. The initial recovery from the existing small diameter <br /> monitoring wells will be evaluated over the first weeks of <br /> operation to determine whether a pumping well designed for <br /> the site specific conditions should be installed. Data <br /> obtained from the pump test, sieve analyses of soil samples <br /> and additional information obtained during the ongoing site <br /> �.. assessment would be used to design and locate this well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.