Laserfiche WebLink
1 i <br /> a barrel of alconox-water mixture The pump was then turned on and allowed to pump the <br /> alconox/water mixture through the pump and purge lines The exterior of the pump and <br />' associated lines were also washed at this time The bailer was decontaminated by washing it in <br /> an alconox-water mixture with a stiff bristle brush, rinsing it with potable water and giving it <br /> a final spray rinse with distilled water. Water brought to the surface during the purge at each <br /> well and the water used for decontamination of equipment was containerized in labeled 55 gallon <br /> drums and stored on a parking lot at the corner of San Joaquin and Market Streets <br /> All water sampling was performed in accord with WESTON's site specific health and safety <br /> plan, which was available onsite during field activities A safety meeting was held with <br />' personnel prior to starting work to review anticipated safety hazards and emergency procedures <br /> The field work for this project was performed under Level D personal protection <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> i <br />' RnS/SJC wP A - 17 oma <br />