My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010357
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
ARCHIVED REPORTS_XR0010357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:22:17 PM
Creation date
5/18/2020 2:52:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010357
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 i <br /> a barrel of alconox-water mixture The pump was then turned on and allowed to pump the <br /> alconox/water mixture through the pump and purge lines The exterior of the pump and <br />' associated lines were also washed at this time The bailer was decontaminated by washing it in <br /> an alconox-water mixture with a stiff bristle brush, rinsing it with potable water and giving it <br /> a final spray rinse with distilled water. Water brought to the surface during the purge at each <br /> well and the water used for decontamination of equipment was containerized in labeled 55 gallon <br /> drums and stored on a parking lot at the corner of San Joaquin and Market Streets <br /> All water sampling was performed in accord with WESTON's site specific health and safety <br /> plan, which was available onsite during field activities A safety meeting was held with <br />' personnel prior to starting work to review anticipated safety hazards and emergency procedures <br /> The field work for this project was performed under Level D personal protection <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> i <br />' RnS/SJC wP A - 17 oma <br />
The URL can be used to link to this page
Your browser does not support the video tag.