Laserfiche WebLink
Alice G. Lenz -2- <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action, and;(2) <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should only <br /> be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> Three bids: Only corrective action costs required by the regulatory agency to protect human health, <br /> safety and the environment can be claimed for reimbursement, You must comply with all regulatory <br /> agency time schedules and requirements and you must obtain three bids for any required corrective <br /> keti6n.,Ifyqu do?nof obtain three bids or a e_yqiv r.of the three- requiremen reimbursement is not <br /> r­ ­­ __ <br /> _ <br /> assured and costs may be rejected as ineligible. <br /> If you have any questions,please contact Barbara Rempel at(916) 341-5761. <br /> Sincerely, <br /> Ronald M.Duff,Fund Manager <br /> ,Underground Storage Tank Cleanup Fund <br /> cc: MT.Gordon Boggs Ms.Margaret Lagorio <br /> RWQCB,Reg. 5 - Sacramento San Joaquin County EHD <br /> 11020 Sun Center Drive P.O.Box 2009 <br /> Rancho Cordova, CA 95670 Stockton, CA 95201 <br /> caitfoTwja En virowmaut21-Proicetfow AoRov <br />