Laserfiche WebLink
A <br /> agreed that one year of quarterly groundwater monitoring would be performed (Table 1-1). It <br /> ., was also agreed that a corrective action plan (CAP) would be prepared following the completion <br />' of one year of quarterly groundwater monitoring (Roy F. Weston, Work Plan for Phase IV Site <br /> Investigation and Quarterly Groundwater Sampling, February 1996). The Phase IV investigation <br />' and first round of groundwater sampling confirmed that soil contamination is present in the <br /> vicinity of MW-2A and that groundwater contamination is not present south (up gradient) of the <br /> former USTs. The fourth quarter of Phase IV groundwater sampling was completed in May <br /> 1997 <br />' This report is the second quarter 1998 groundwater monitoring report which represents the <br /> fourth and final report in the Phase V groundwater sampling effort and presents the results of <br />' continued groundwater sampling following the schedule presented in Table 1-1. The CAP was <br /> submitted to EHD in January 1998 <br /> Table 1-1 <br /> Sampling Schedule <br /> Quarter Monitor Wells to be Sampled <br /> First MW-2A and MW-9 <br /> Second MW-2A, MW-3A, MW4, MW-6, MW-7, and MW-9 <br /> Third MW-2A and MW-9 <br /> Fourth MW-2A, MW-3A, MW-4, MW-5, MW-6, MW-7, and MW-9 <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> i <br /> 1 <br /> L TRO1ECrS%SANJOQMA1HSA_98JUN 3 July 19% <br />