My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010374
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SUTTER
>
145
>
2900 - Site Mitigation Program
>
PR0543041
>
ARCHIVED REPORTS_XR0010374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 3:45:02 PM
Creation date
5/18/2020 3:00:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010374
RECORD_ID
PR0543041
PE
2960
FACILITY_ID
FA0024604
FACILITY_NAME
HUMAN SERVICES AGENCY
STREET_NUMBER
145
Direction
S
STREET_NAME
SUTTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912016
CURRENT_STATUS
01
SITE_LOCATION
145 S SUTTER ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wWNGE19 SY.NERS�`Eli11w15 <br />' 2.0 FIELD SAMPLING SUMMARY <br /> • <br />' Groundwater samples were collected from monitor wells MW-2A, MW-3A, MW-4, MW-5, <br /> MW-6, MW-7, and MW-9 (Figure 1-1) on 17 and 18 June 1998. Groundwater sampling data <br />' sheets are presented in Appendix B. <br />' Prior to sampling, water levels in all wells were measured on 17 June The standing water <br /> volumes within wells scheduled for sampling were then calculated using the water level <br /> measurements and total well depths A submersible pump was used to purge three well casing <br />' volumes from each of the monitor wells. <br />' At the beginning and during the purge process, the temperature, pH, and specific conductance <br /> of the purge water was measured. This information was recorded on a sampling data sheet <br />' Groundwater samples for benzene, toluene, ethylbenzene, and xylene (BTEX) and purgeable <br /> petroleum hydrocarbons as gasoline (TPH-G) analysis were collected from the wells with a <br /> disposable bailer and nylon string The groundwater samples were transferred into 40 ml glass <br /> sample containers Sample containers were checked for air bubbles The sample containers <br /> were sealed in a plastic bag, placed with ice in an insulated chest, and logged on a chain-of- <br /> custody form for delivery to the analytical Iaboratory. <br /> The pump used to purge and sample the wells was thoroughly cleaned prior to each use by <br /> placing it into a container of tap water and washing the outside of the pump The disposable <br /> hose was discarded after purging each well. <br />' <br /> Purge water from monitor wells MW-3A, MW-4 MW- - <br /> g to e s MW 3 , 5, MW 6, MW-7, and MW-9 was stored <br />' in a holding tank located at 222 E Weber Avenue The purge water stored in the holding tank <br /> will be sampled and discharged to the sanitary sewer prior to the next quarterly sampling event <br />' under a permit from the City of Stockton Department of Municipal Utilities Purge water from <br /> MW-2A was stored in a 55 gallon drum located at 100 N Hunter Street MW-2A purge water <br /> will be disposed of at a licensed treatment facility <br /> The groundwater samples were analyzed by EPA Method 8020 for BTEX and by EPA Method <br />' 8015M for TPH-G. Groundwater sample analyses were performed by American Environmental <br /> Network in Pleasant Hill, California. <br /> 1 <br /> L TROlEC rWANJOQWSA\HSA_99JUN 4 July 19% <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.