Laserfiche WebLink
m moldenhauer <br /> L.ALEX MOLDENHAUER,L.S.,P.E. <br /> e engineering PRINCIPAL <br /> C company <br /> 337.871 <br /> June 24, 1988 <br /> Gary Reents, Project Engineer <br /> California Regional Water Quality <br /> Control Board, Central Valley Region <br /> 3443 Routier Road <br /> Sacramento, CA 95827-3098 <br /> Subject: SOUTHWEST HIDE COMPANY GROUNDWATER QUALITY INVESTIGATION <br /> AT MANTECA, CALIFORNIA. <br /> Dear Gary: <br /> Attached is the Interim Report for the Southwest Hide Company Groundwater <br /> Study. The report contains the following items pertaining to the <br /> above-mentioned groundwater investigation: <br /> 1. An introduction briefly explaining work already performed and work <br /> expected to be performed in the future. <br /> 2. A summary of the raw data gathered at the site along with copies <br /> of laboratory analysis reports for all the latest sampling to June <br /> 15, 1988. A map showing sampling locations is attached. <br /> 3. A description of the latest work completed to June 15, 1988. <br /> 4. A work plan for work proposed to be done July 1, 1988 through <br /> December 31, 1988. <br /> 5. A time schedule for performing the above recommended work. <br /> We believe that the proposed work along with previous work completed <br /> will provide a good definition of the salt content of the soil in the <br /> upper region of the aquifer. We believe that the identified plume <br /> i <br /> 1107 KENNEDY PLACE,SUITE 7,DAVIS,CA 95616•(916)756-2250 <br /> E N G I N E E R I N G CONSULTANTS • P R O J E C T P L A N N E R S <br />