My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
3500 - Local Oversight Program
>
PR0545671
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 11:46:17 AM
Creation date
5/19/2020 11:38:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545671
PE
3528
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regional Office <br /> INTERNATIONAL 4585 Pacheco Boulevard <br /> TECHNOLOGY Martinez,California 94553-2233 <br /> CORPORATION 5I0-372-9100 <br /> Fax:510-372-5220 <br /> May 15, 1996 <br /> IT Project No. 190916.011 <br /> Ms. Mary Meays <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 East Weber Street <br /> Stockton, CA 95201 <br /> Letter Report of Monitoring Well Abandonment Activities <br /> Pacific Bell Facility <br /> 345 North San Joaquin Street <br /> Stockton, California <br /> Dear Ms. Meays: <br /> IT Corporation (IT) was retained by Pacific Bell to complete the abandonment of three two- <br /> inch diameter groundwater monitoring wells and two two-inch diameter vapor monitoring <br /> wells, at the above referenced Pacific Bell Facility located in Stockton, California (Figures 1 <br /> and 2). The abandonment procedures were completed on May 1, 1996. The following letter <br /> work plan discusses the well abandonment procedures as they were executed and completes <br /> all required work for final site closure. <br /> Field Procedures <br /> Prior to commencement of work, a Tailgate Safety Meeting was held to ensure that the proper <br /> site safety precautions were observed. This safety meeting was conducted in accordance with <br /> the site-specific health and safety plan. <br /> Abandonment activities were performed on May 1, 1996 by representatives of Gregg Drilling <br /> and Testing, Incorporated (a C-57 licensed driller), under IT supervision. A well <br /> abandonment permit was obtained from your office as well as an encroachment permit from <br /> the City of Stockton, prior to commencement of field activities. <br /> The well box and cover at each of the five wells was hammered out using heavy hand tools. <br /> Following well box removal, a tremie pipe was inserted immediately into each boring, with a <br /> Portland Cement grout poured in and finished to one foot below grade. As the wells were <br /> grouted under pressure, the volume of sealing material emplaced during abandonment was <br /> IT Corporah'on is a wholly owned subsidlcry of International Technology Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.