My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
3500 - Local Oversight Program
>
PR0545671
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 11:44:18 AM
Creation date
5/19/2020 11:40:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545671
PE
3528
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regional Office + <br /> 4585 Pacheco Boulevard <br /> INTERN TLO N Martinez,California 94553-2233 <br /> ® 510-372-9100 <br /> CORPORATION <br /> Fax: 510-372-5220 <br /> February 29, 1996 <br /> IT Project No. 190916.011 <br /> ' Ms. Mary Maeys <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 East Weber Street <br /> Stockton, CA 95201 <br /> Work Plan for Monitoring Well Abandonment Activities <br /> Pacific Bell Facility <br /> 345 North San Joaquin Street <br /> Stockton, California <br /> Dear Ms. Maeys: <br /> IT Corporation (IT) was retained by Pacific Bell to generate this letter work plan for the <br /> abandonment of three two-inch diameter groundwater monitoring wells and two two-inch <br /> j diameter vapor monitoring wells, at the above referenced Pacific Bell Facility located in <br /> Stockton, California (Figure 1). These wells are no longer in use and closure requirements <br /> have been met (as per our phone conversation on February 8, 1996). The following letter <br /> work plan discusses planned well abandonment procedures and disposition of the waste <br /> materials generated during completion of abandonment activities. <br /> Field Procedures <br /> Prior to commencement of work, a Tailgate Safety Meeting will be held to ensure that the <br /> proper site safety precautions are.observed. This safety meeting will be conducted in <br /> accordance with the site-specific health and safety plan. <br /> Abandonment activities will be performed by representatives of Gregg Drilling and Testing, <br /> Incorporated (a C-57 licensed driller), under IT supervision. A well abandonment permit will <br /> be obtained from your office as well as an encroachment permit from the City of Stockton, <br /> prior to commencement of field activities. <br /> The well box and cover at each of the five wells will be hammered out using heavy hand <br /> ' tools. Each well will then be over-bored to its total depth, utilizing an eight-inch outer <br /> diameter hollow-stem auger attached to a B-61 drill rig. Groundwater monitoring wells MW- <br /> w <br /> 1T Corporation is a wholly owned subsidiary of International Technology Corporchon <br /> 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.