Laserfiche WebLink
INTERIQONAL TECHNOLOGY-CORPbI ATION i <br /> selected . <br /> ected for. <br /> anal <br /> .,r yses.will be placed into the.bin with dell cuttings'to-Await disposal. -Used <br /> .'. <br /> sample sleeves`will-bosed of with.the drill --Aft.' <br /> cuttingser'receipt of the analytical <br /> results allstockpiledcuttings and Water.will be pxoperly,disposed <br /> -2.9 ,Quality Assurance%Quality Control <br /> l Investigative procedures will conform to:IT corporation QA/QC:GUIDELINES.".:California,-' <br /> Registered Geologist,Dennis ryP Dunn will have tech&cai supervision for all work..;.'I1ie <br /> drilling contractorYwill have a C-7 Water WellDriller Contractors License. <br /> 2.10 Presentation: of Results - <br /> m - = <br /> # .-At the':conclusion of.the field work, IT will prepaze a`Site'Investigation Report which will'be - <br /> a summary of allactivities, procedures,.firid2ngs,:_and interpretations on the site. The Site <br /> Assessment Report will include, at.a minimum,1.the following <br /> Site'uistory - <br /> fi Location Map <br /> : . <br /> Site,Plan., - <br /> 1 Soni Boring:Lo <br /> ,Monitoring Well ConstriictionDiagrams <br /> ' - - <br /> Signed Laboratory'Reports <br /> Figures showing.-analytical results of:the soil and groundwater samples- <br /> Tables summarizing analytical data x <br /> Findings <br /> Conclusions' <br /> Recarnmendations- <br /> At the completion of the work, TT rosy present_-Pa6f c Bell with-.a proposal:for .additional: <br /> p: work-recommended by iT or_requued by-regula'tory`-agencies <br /> MZJW28 921ENG/9783 MER 10 <br />