Laserfiche WebLink
w o Responsibilities <br /> Ip <br /> 2.1 All Personnel <br /> ' Each person is responsible for their own health and safety, for completing tasks in a safe <br /> manner and for reporting any unsafe acts or conditions to his/her supervisor and the Project <br /> ' Field Coordinator (FC) All persons on-site are responsible for continuous adherence to <br /> health and safety procedures during the performance of any project work. In no case may <br /> work be performed in a manner winch conflicts with the intent of, or the inherent safety <br /> precautions expressed in this HASP After due warning, persons who violate procedure and <br /> work rules may be dismissed from the site, terminated, or have their contract revoked <br /> ' Blatant disregard or repeated infractions of health and safety policies are grounds for <br /> immediate dismissal and/or removal from the work area <br /> All IT and subcontractor personnel are required to read and acknowledge their understanding <br /> of this HASP. All project personnel are expected to abrade by the requirements of this HASP <br /> and cooperate with project management in ensuring a safe and healthful work site. Site <br /> personnel are required to immediately report any of the following to the Project FC: <br /> • Accidents and injuries, no matter how minor, <br /> • Unexpected or uncontrolled release of chemical substances, <br /> • Any signs or symptoms of chemical exposure, <br /> • Any unsafe or malfunctioning equipment; and <br />' Any changes in site conditions winch may affect the health and safety of project <br /> personnel <br />' 2.2 Project Manager <br /> The Project Manager (PM) has overall responsibility for the health and safety of all personnel <br /> on the project. His responsibility with regard to health and safety is to maintain company <br /> policy and resolve health and safety issues with the assistance and guidance of the Project HS <br /> Manager The PM will provide the Project HS Manager with the company name and <br /> representatives of those contractors being considered for hare, as well as those hired, to allow <br />' required preliminary information to be collected an a timely manner <br /> The PM is responsible to: <br /> MZ/05-09-94/USTN4-0063 bk 2-1 <br />