My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009068
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
3500 - Local Oversight Program
>
PR0545671
>
ARCHIVED REPORTS_XR0009068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 12:12:02 PM
Creation date
5/19/2020 11:46:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009068
RECORD_ID
PR0545671
PE
3528
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Personnel on site. He may not, however, authorize changes to or variances from the HASP. <br /> Any modification of project safety requirements must be approved by the HS Manager. <br /> 2.6 Subcontractor Management and Personnel <br /> ' Subcontractor management is responsible for the compliance of theirrsonnel <br /> ' <br /> Project HASP. Since subcontractors are hired for their Pe with this <br /> specif c exPrimary responsibility responsibility for the health and safety of thein expertise, they must assume <br /> personnel. The subcontractors Field <br /> Supervisor or Crew Leader will also be responsible for performing a weekly safety inspection <br /> Of their operations. A copy of this inspection must be submitted to the Project FC each week <br /> ' Subcontractor personnel must abide by the requirements of this HASP, and must follow the <br /> instructions of their company management and IT Project Representatives in all health and <br /> safety related matters <br /> 2.7 On-Site Personnel and Visitors <br /> No visitor will be allowed within the Work Zones without authorization from the PM and the <br /> Project FC Visitors requesting authorization to enter the Contamination Reduction Zones <br /> (CRZs) or Exclusion Zones (EZs) must meet the requirements established for Project <br /> Personnel, including appropriate medical exams and training On-site client personnel will <br /> also be held to these requirements. <br /> 1 <br /> 1 <br /> MZ'05-09-4WsT/944ft3 bk 2-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.