Laserfiche WebLink
' Personnel on site. He may not, however, authorize changes to or variances from the HASP. <br /> Any modification of project safety requirements must be approved by the HS Manager. <br /> 2.6 Subcontractor Management and Personnel <br /> ' Subcontractor management is responsible for the compliance of theirrsonnel <br /> ' <br /> Project HASP. Since subcontractors are hired for their Pe with this <br /> specif c exPrimary responsibility responsibility for the health and safety of thein expertise, they must assume <br /> personnel. The subcontractors Field <br /> Supervisor or Crew Leader will also be responsible for performing a weekly safety inspection <br /> Of their operations. A copy of this inspection must be submitted to the Project FC each week <br /> ' Subcontractor personnel must abide by the requirements of this HASP, and must follow the <br /> instructions of their company management and IT Project Representatives in all health and <br /> safety related matters <br /> 2.7 On-Site Personnel and Visitors <br /> No visitor will be allowed within the Work Zones without authorization from the PM and the <br /> Project FC Visitors requesting authorization to enter the Contamination Reduction Zones <br /> (CRZs) or Exclusion Zones (EZs) must meet the requirements established for Project <br /> Personnel, including appropriate medical exams and training On-site client personnel will <br /> also be held to these requirements. <br /> 1 <br /> 1 <br /> MZ'05-09-4WsT/944ft3 bk 2-5 <br />