My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009068
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
3500 - Local Oversight Program
>
PR0545671
>
ARCHIVED REPORTS_XR0009068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 12:12:02 PM
Creation date
5/19/2020 11:46:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009068
RECORD_ID
PR0545671
PE
3528
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' addressed The <br /> Project FC will be on-site during all project related a=vities or will delegate <br /> his responsibilities to qualified supervisory personnel (i e., person(s) having 8-hours of <br /> supervisory training in addition to OSHA's 40-hour 29 CFR 1910120 framing), as <br /> ' appropnate <br /> Other responsibilities include. <br /> ' Reading and being familiar with the Project HASP, as well as appropriate IT <br /> Pohcies and Procedures; <br /> ' Stopping work as required to ensure personnel safety and protection ofro <br /> perty <br /> or where life or property threatening noncompliance with safety requirements are, <br /> found, <br /> • Monitoring the use of required protective clothing and safe work practices, <br /> • Determining and posting routes to capable medical facilities and emergency <br /> ' telephone numbers (including poison control facilities), and arranging emergency <br /> transportation to medical facilities; <br /> • Notifying Iocal public emergency officers of the nature of the operations, and <br /> posting of their telephone numbers m an appropriate location; <br /> • Conducting and documenting required project specific traming; <br /> • Observing project personnel for signs of chemical or physical trauma, <br /> • Conducting job site safety audits at least weeldy; <br /> Ensuring that all personnel have beenven the <br /> $i proper medical clearance, have <br /> met appropriate training requirements, and have the appropriate documentation <br /> posted in the work area, <br /> • Monitoring Project Personnel to ensure compliance with the HASP, <br /> • Establishing Work Zones as appropriate, <br /> • Presenting tailgate safety meetings and maintaining attendance records; <br /> • Monitoring that decontamination procedures are meeting established criteria, <br /> • Acting as Project Hazard Communication <br /> 1910 1200, Coordinator as required by 29 CFR <br /> ' <br /> • Responding to employee's/contractor's health and safety concerns; and <br /> • Periodically auditing subcontractor qualifications to ensure only <br />' qualified personnel are allowed in the work area. properly <br /> The Project FC is Damel Bannon. <br /> 2.5 On-Site Health and Safety Coordinator <br />' The Project FC will also serve as the On-Site Health and Safety Coordinator dining this work <br /> Thus, he will be responsible for ensuring complete compliance with the HASP by all <br /> MZVi-M9VUSTN4.0063 bk 24 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.