Laserfiche WebLink
TABLE 4 (Continued) <br /> COST ESTIMATE DETAH, <br /> Item Unit Total <br /> No. Description Unit Qty Rate Cost <br /> O1 Mobilization/Demobili7ation LS 1 4,500.00 4,500.00 <br /> 02 Compliance with Health & Safety Plan LS 1 2,500.00 2,500.00 <br /> 03 Removal Action in Area A <br /> 1. Removal, packaging, transportation, and disposal at a permitted TSD facility of sump GAL 75 30.00 2,250.00 <br /> contents described in Table 1. <br /> 2. Waste profiling for acceptance at TSD. Waste 2 1,500.00 3,000.00 <br /> Type <br /> 3. Demolition of the 4'xl.7'x2.5' sump, and removal, packaging, transportation, and LS 1 5,000.00 5,000.00 <br /> disposal at a permitted TSD facility of the debris from the demolished sump. <br /> 4. Backfill with clean soil and compaction. CY 1 25.00 25.00 <br /> 5. Provision of 6-inch thick concrete surface on top of compacted soil, to match CY 3.5 300.00 1,050.00 <br /> existing floor level. <br /> 04 <br /> Subtotal for Area A 11,325.00 <br /> Removal Action in Area C <br /> 1. Removal, packaging, transportation, and disposal at a permitted TSD facility of the LS 1 5,500.00 5,500.00 <br /> wooden planks and contents of the sump, described in Table 1. <br /> *2. Removal, packaging, transportation and disposal at a permitted TSD facility, of Ib 5.75 Extra <br /> sediments from the sediment traps. <br /> 3. Waste profiling for acceptance at TSD. Waste 5 1,500.00 7,500.00 <br /> Type <br /> 4(a). Clean up of the 50'x1 1'x5' pit (quantity of 15) 4.5'xl'xl' concrete pillars, and the <br /> 1.5'xl.5'xl.5' sump to achieve non-detect levels for contaminants shown in LS 1 13,000.00 13,000.00 <br /> Table 1. <br /> * Quantity of sediments in the sediment traps needs to be ascertained. The sediments, however, will be removed and disposed off at a permitted TSD facility at the <br /> unit rate indicated for the item. <br />