Laserfiche WebLink
TABLE 4 (Continued) <br /> COST ESTIMATE DETAIL (Continued) <br /> Item Unit Total <br /> No. Description Unit Qty Rate Cost <br /> 4(b). Wipe Sampling on all surfaces of the pit, and sample analysis. SAMPLE 34 350.00 11,900.00 <br /> 5. Provision of an epoxy, protective layer (approximately 16 mil dry thickness) SF 1700 2.75 4,675.00 <br /> on clean concrete surface. <br /> Subtotal for Area C 42,575.00 <br /> 05 Removal Action in Area J <br /> 1. Removal and disposal at a permitted TSD facility of Pb contaminated oil from GAL 900 10.20 9,180.00 <br /> the sump, described in Table 1. <br /> 2. Waste profiling for acceptance at TSD. Waste 3 1,500.00 4,500.00 <br /> Type <br /> 3(a). Clean up of the 10'x4'x8.3' sump to achieve non-detect levels for contaminants LS 1 9,600.00 9,600.00 <br /> of concern shown in Table 1. <br /> 3(b). Wipe sampling on all surfaces of the sump, and sample analysis. SAMPLE 34 350.00 11,900.00 <br /> 4. Backfill with clean soil and compaction. CY 13 25.00 325.00 <br /> 5. Provision of 6-inch thick concrete surface on top of compacted soil, to match CY 1 300.00 300.00 <br /> existing floor level. <br /> Subtotal for Area J 35,805.00 <br /> LEGEND: CY - Cubic Yards <br /> SF - Square Foot <br /> LS - Lump Sum <br /> GAL - Gallon <br />