My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 4:27:09 PM
Creation date
5/19/2020 2:59:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill, Overfill , Leak Detection and Secondary Containment Equipment at UST Facilities <br /> NOTE : If the fill cap is not included in the the spill bucket . The vacuum level is monitored for <br /> spill bucket test and/or the cap is not tight, it a 1 -minute period , <br /> could be the source of potential fuel contami - 6 . 3 . 3 Test Equipment . Test equipment shall <br /> nation from water intrusion . include : <br /> • vacuum test apparatus (The test apparatus may <br /> NOTE : Before permanently plugging , ensure be available from the spill bucket manufacturer.that local regulations allow the drain valve to It includes an air pressure regulator, a vacuum <br /> be permanently plugged . source, a vacuum gauge with a minimum 0- 50 <br /> inch water column range and a control valve . <br /> 6 . 2 . 5 Test Procedure . The control valve is used to adjust the vacuum <br /> 1. Add water to the spill bucket to a level within level . ) ; <br /> 1 .5 inches of the top of the spill bucket. Allow • test cover (The cover is equipped with a test fit- <br /> the water to settle for 5 minutes before the initial ting . ) ; <br /> water level measurement is taken . <br /> • plumber ' s plug (appropriate size, if used) ; <br /> 2 . Place the measuring stick vertically at the lowest <br /> point in the spill bucket and extending above the • stopwatch or other time-measurement device <br /> water level to allow for an accurate measure- capable of measuring a 1 -second increment ; <br /> ment to be taken . The location of the measuring Basketing material (The purpose of the gas- <br /> stick must remain the same for each water level keting material is to provide an air-tight seal <br /> measurement. Document the initial water level between the test cover and the spill bucket. ) . <br /> measurement as measured from the bottom of <br /> the spill bucket . Alternative measurement meth- 0 50" water column <br /> ods may be used provided that measurement to Vacuum Vacuum Gauge <br /> 1 / 16 (0. 063 ) inch can be made . source <br /> 3 . Take all precautions to prevent the water level <br /> from being disturbed during the duration of the control <br /> test . Valve <br /> 4 . After 1 hour, document the ending water level <br /> measurement . <br /> 5. Upon completion of the test, remove and dis- <br /> pose of the water according to Section 6 .7 , and <br /> dry the inside of the spill bucket before returning Plumber's Plug in <br /> it to service . Tank Riser Pipe <br /> 6 . 2 . 6 Pass/ Fail Criteria . If the water level has <br /> dropped less than 1 /8 (0 . 125 ) inch , the spill bucket <br /> passes the integrity test. <br /> If the water level has dropped 1 /8 (0 . 125 ) inch or <br /> greater, the spill bucket fails the integrity test. <br /> 6 . 3 Spill Bucket Integrity Testing — Vacuum Test FIGURE 6-2 . The cover must make a tight seal with the <br /> Method . spill bucket to prevent leakage when the vacuum is <br /> 6 . 3 . 1 Purpose . This method is used to test the pulled during the test. <br /> integrity of single-walled spill buckets or the pri- <br /> mary containment of secondarily contained spill WARNING : Use only an air-operated vac- <br /> buckets . uum source or a vacuum pump pow- <br /> 6 . 3 . 2 Description of Test. Using a specially ered by an explosion-proof motor. Vacuum <br /> equipped test cover, a partial vacuum is applied to pumps with electric motors that are not <br /> pei . org <br />
The URL can be used to link to this page
Your browser does not support the video tag.