Laserfiche WebLink
KLEINFELDER <br /> • The client will be fully responsible for relaying to Kleinfelder personnel the exact former <br /> tank location. Kleinfelder does :not guarantee the accuracy of the tank location (either <br /> expressed or implied). <br /> PROJECT TIME SCHEDULE <br /> Upon receipt of our signed contract, the estimated tinge schedule will be as follows: <br /> STANDARD ANALYTiCAL TURN-AROUND TIME + <br /> Approximate Time Task <br /> Week - 0 NoCification o:fproposal acceptance in writing (signed contract) <br /> Week 0 - 3:" "Mask I-01 -Permitting* and pre-field activities <br /> Week 3 - 4 Task 1'02 - .Drilling of lour Soil Borings <br /> Week 4 - 6 Chemical Analyses" <br /> Week 6 - 7 Task F03 - Reporting <br /> * Kleinfelder has no control over permitting review time by regulatory agencies involved with <br /> the project. It is possible that delays could occur; however., Kleinfelder will slake every i <br /> effort to expedite the process. 1 <br /> Kleinfelder has no control over chemical analysis involved with the project. It is possible <br /> that delays could occur-, however., 1KIel'n-Felder will slake every effort to expedite the process. 1 <br /> LIMITATIONS <br /> The proposed scope of work requested by Delta Sign & Crane Scrvice is limited to evaluating <br /> environmental concerns associated with the potential presence of hazardous substances in <br /> association with a former US's' cif the referenced property, this limited' elivironmental <br /> evaluation does not include sampling and analysis or other services not described. Other <br /> environmental or eotechnical investigative services can be provided for additional fees. The <br /> scope of services described here :is not intended to be inclusive, to identify all potential <br /> concerns, or to eliminate the possibility of environmental problems. Within current technology, <br /> no level of asscssnlent can show conclusively that a property or its structures are completely <br /> free of hazardorls substances. Therefore, Kleurfelder cannot 01Ter a ccrtification that the <br /> property is clear of environmental liability. Kleinfelder will assume no responsibility or <br /> liability whatsoever for any claim. loss of property value, damage, or iniury which results From <br /> pre-existing hazardous substances being encountered or present on the proiect site, or frons the <br /> discovery Of such hazardous substances. Kleinfelder offers a range of investigative and <br /> engineering services to suit the varying needs of our clients. Although risk can never be <br /> eliminated, more detailed and extensive invesrigations yield more information, which Islay help <br /> 20-YI'8-124/20I81'I41 Page 5 o1 7 <br /> OO 1998, Klcinf'cldcr. Inc. <br /> lune 16, 1998 <br />