Laserfiche WebLink
2.2 Drilling and Sampling Procedures <br /> Drilling will be accomplished using a. truck mounted auger. The east boring will be advanced to a depth <br /> of 1.5 feet with soil samples collected at about 5 and. 14 feet below ground.surface(bgs). The west boring <br /> will be advanced to a depth of 5 feet with a sample collected.at about 3 feet bgs. The borings will not be <br /> advanced. below 16 feet bgs as this is the depth of needed inforrnatio.n_ The samples will be placed in <br /> discreet laboratory supplied containers 'Cor analysis. All samples will be labeled with a unique alpha- <br /> numeric identifier, site location, name of sampler, etc,; placed in a cooler to keep them at the appropriate <br /> temperature (40 C) and delivered to a state certified laboratory' as soon as possible. A Chain of Custody <br /> form will be completed for the samples prior to leaving the site. <br /> The Lodi Department of Public Works was sent a copy of this work plan for review prior to submittal to <br /> San Joaquin County. Mr. Ri.chard. Prima, director of public works, slated that.public works did not need <br /> to issue a written a.uthoriza.ti.on, for this work to proceed. He a.l.so requested that work include borings to a <br /> depths of about 50.feet bgs to collect information of groundwater at:the site;however, due to the nature of <br /> the project and that this information is being collected mainly for informational and health and. safety <br /> purposes, extending the borings to th.e suggested depth would be cost prohibitive and. surplus to the <br /> requirements of the project. After discussion with Mr_ Prima he indicated that.he would still suggest this <br /> additional work, but it was by no means a requirement.for the project to go forward. <br /> 2.3 Laboratory Analysis <br /> Laboratory analysis will be undertaken at Curtis and Tompkins Ltd_, Located at 2323 Fifth Street, Berkley, <br /> California 94720. The soil samples will be analyzed for VOCs using EPA Method 3260, and for Total <br /> and TPH.-DRO using EPA Method 8015- <br /> 2.4 Boring construction/deconstruction methods <br /> The boring will be advanced. using a truck-mounted rig with, an eight inch diameter hollow-stem auger. <br /> Samples will be collected. it appropriate intervals using a, modified California-style sampler. Upon <br /> completion of the boring the hole will be backfilled using cement grout. <br /> The modified Califomia-style sampler will be decontaminated between each envirom:n.enta.l sample using <br /> a non-phosphate detergent and distilled water and rinsed with distilled water. Augers and center plugs <br /> and. other drilling equipment that comes into contact with subsurface soils will be decontaminated before <br /> removal from the site using a pressure washer: water will be collected in a.tub or basin. <br /> 2.5 Disposal of soil and/or water generated <br /> Soils generated during boring activities and water generated during decontamination activities will be <br /> drummed in separate labeled .metal 55-gallon drum and. stored on site until analytical. results of the <br /> contents are received so as to determine the appropriate disposal method. <br /> Work Plan <br /> Site Name: Sacramento Street 2 <br /> Lushf"C <br /> Site Number: BRNSC-13338A <br />