My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
710
>
2900 - Site Mitigation Program
>
PR0536650
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 8:36:22 AM
Creation date
5/20/2020 8:32:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536650
PE
2950
FACILITY_ID
FA0021042
FACILITY_NAME
ACCURATE AIR ENGINEERING
STREET_NUMBER
710
Direction
N
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
90703
CURRENT_STATUS
01
SITE_LOCATION
710 N SACRAMENTO ST
P_LOCATION
02
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Limited Site Investigation Irerracon <br /> Accurate Air Engineering, Inc. * Lodi, California <br /> August 18, 2011 Terracon Proposal No. 60110154 <br /> our recommendations are based solely upon data obtained at the time and within the scope of <br /> these services. <br /> C. COMPENSATION <br /> The Scope of Services outlined in this proposal will be performed on a lump sum basis for <br /> If, as a result of these services, additional work is required outside the scope of this <br /> proposal, you will be contacted, and upon request, proposed costs for additional work will be <br /> provided. Client authorization will be obtained prior to commencement of any additional work <br /> outside the scope of this proposal. Estimated project costs are summarized below: <br /> ESTIMATED PROJECT COST <br /> Consulting Labor <br /> (includes preparing a site specific health and safety <br /> plan, obtaining boring permits, field activities, and <br /> report preparation) <br /> Drilling <br /> Laboratory <br /> Expenses <br /> (includes permit fees, equipment rentals, and travel <br /> costs) <br /> ESTIMATED TOTAL <br /> Drilling, laboratory, and other direct costs include a 15% handling fee. The project cost <br /> summary is based on the scope of services outlined in this proposal. This proposal and cost <br /> estimate were prepared based on the following assumptions: <br /> is Client will provide to Terracon, prior to mobilization, legal right of entry to the site <br /> (and other areas if required) to conduct the scope of services. <br /> ■ Client will notify Terracon, prior to mobilization, of any restrictions, special site <br /> access requirements, or known potentially hazardous conditions at the site (e.g., <br /> hazardous materials or processes, specialized protective equipment <br /> requirements, unsound structural conditions, etc.) <br /> Utilities on private land that are not located by,public companies will be located <br /> by property owner/operator. <br /> ■ Work can be performed during normal business hours (Monday through Friday, <br /> 7:00 am to 7:OO pfri�. <br /> 6 <br /> Reliable ■ Responsive■ Resourceful <br />
The URL can be used to link to this page
Your browser does not support the video tag.