My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
710
>
2900 - Site Mitigation Program
>
PR0536650
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 8:36:22 AM
Creation date
5/20/2020 8:32:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536650
PE
2950
FACILITY_ID
FA0021042
FACILITY_NAME
ACCURATE AIR ENGINEERING
STREET_NUMBER
710
Direction
N
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
90703
CURRENT_STATUS
01
SITE_LOCATION
710 N SACRAMENTO ST
P_LOCATION
02
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Limited Site Investigation Irerracon <br /> Accurate Air Engineering, Inc. a Lodi, California <br /> August 18, 2011 a Terracon Proposal No. 60110154 <br /> * Traffic control services are not required. <br /> The site is readily accessible by truck. <br /> If any of these assumptions or conditions is not accurate or changes during the project, the <br /> stated fee is subject to change. Please contact us immediately if you are aware of any <br /> inaccuracies in these assumptions and conditions, so we may revise the proposal or fee. <br /> It should be noted, if affected soil or groundwater is discovered during the LSI, the owner, <br /> operator or similar responsible party may have release reporting obligations under applicable <br /> state law or regulations. <br /> Please note that since Terracon does not have an established credit history with Accurate Air <br /> Engineering, Inc., payment will be required prior to delivery of the final report. Please note that <br /> payment of 50 percent will be required prior to start of work. The remaining 50 percent will be <br /> required prior to delivery of the final report. Acceptable payment methods include credit cards <br /> (MasterCard, VISA, and Discover) and checks. Terracon will forward an invoice to the client <br /> prior to report delivery to facilitate payment. <br /> D. GENERAL COMMENTS <br /> We have attached Terracon's Agreement for Services that is incorporated into this proposal and <br /> that you must sign to authorize us to do this work. This proposal is valid for 60 days from the <br /> date of this proposal. We appreciate the opportunity to provide this proposal and look forward <br /> to working with you on this project. If this proposal meets with your approval, please sign the <br /> attached Agreement for Services and return it to our Irvine office via facsimile at 949-660-9732, <br /> electronic mail or mail. <br /> If you should have any questions or comments regarding this proposal, please contact either of <br /> the undersigned. <br /> Sincerely, <br /> 1 Cerracon <br /> earl J. Pereira, P.G. „ Carl A.�Parten <br /> Senior Project Manager Office Manager <br /> Attachment— Agreement for Services <br /> Proposed Boring Locations <br /> 7 <br /> Reliable■ Responsive ■ Resourceful <br />
The URL can be used to link to this page
Your browser does not support the video tag.