Laserfiche WebLink
Installation of Two Air Soaree Wells and Three Vapor Wells <br /> This task includes mobilization to the site, advancingtwo soil bones and completing them as air <br /> g P 8 <br /> sparge wells, and then advancing three soil borings and completing them as vapor wells The <br /> proposed locations of the air sparge and vapor wells are shown on Figure 2 <br /> Two borings will be advanced to depths of 33 and 35 feet below ground surface (bgs) and <br /> completed as air sparge wells, and three borings will be advanced to depths of 30 feet bgs and <br /> completed as vapor wells The borings will be advanced using 8-inch 0 D hollow stem augers <br /> Drilling will be conducted by Spectrum Exploration, Inc , a State-licensed (C57) drilling <br /> company A field geologist will be present to Iog all drill cuttings and soil samples Descriptions <br /> of soil types encountered, sample collection intervals, and well construction details wilt be <br /> recorded on boring/well logs Soil samples will be collected at five foot intervals and up to two <br /> samples from each boring will be sent using chain-of-custody record to a State-certified <br /> laboratory for analysis of total petroleum hydrocarbons as gasoline (TPHg) and benzene, toluene, <br /> ethylbenzene, and xylenes (BTEC <br /> The wells will be constructed of 2-inch inside diameter PVC well screen and casing The air <br /> sparge well located within the former tank pit will be constructed with a screened interval from <br /> approximately 32 to 35 feet bgs, and the air sparge well located east of the former tank pit will be <br /> constructed with a screened interval from 30 to 33 feet bgs The vapor well located within the <br /> former tank pit will be constructed with a screened interval from approximately 20 to 30 feet bgs, <br /> and the two vapor wells Iocated outside the former tank pit will be constructed with screened <br /> intervals from 10 to 30 feet bgs To protect the integrity of the wells, locking, water-tight well <br /> plugs will be installed on each well, and water-tight, traffic rated, wellheads labeled "morutoring <br /> well" will be concreted over each well All drill cuttings will be drummed and stored on-site <br /> pending laboratory results <br /> Pilot Test <br /> The new wells will be used to conduct a pilot test to determine the efficiency of vapor extraction <br /> and air sparging as a remediation technique The details concerning the pilot test will be discussed <br /> in a separate workplan_ <br /> Re 2ortPre aration <br /> Following receipt of laboratory results, a report will be prepared summarizing the findings of the <br /> subsurface investigation for submittal to the client and PHSIEHD The report will suinmanze <br /> field and laboratory procedures as well as all analytical data and contain recommendations for soil <br /> and groundwater remediation pilot tests <br /> -t94373Vq)oM�wpO496&d= 2 <br /> • <br /> U9 H <br />