Laserfiche WebLink
J. <br /> In August 1993, wells MW-1, MW-2, and MW-3 were monitored and sampled Analytical results <br /> showed that M`W-1 had no measurable concentrations of petroleum hydrocarbons in the <br /> groundwater Wells MW-2 and MW-3 contained detectable levels of petroleum hydrocarbons A <br /> program of quarterly groundwater monitoring and sampling was begun in March 1994 <br /> In August 1995, Smith Environmental conducted a subsurface site investigation to further define the <br /> extent of contamination in groundwater at the site Smith Environmental supervised the installation of <br /> monitoring wells MW-4, IMW-5 and MW-6 These three new wells were developed and sampled <br /> along with monitoring wells MW-1, MW-2, and MW-3 Analytical results of groundwater samples <br /> from the sic morutonng wells indicated the presence of elevated concentrations of petroleum <br /> hydrocarbons in the vicinity of wells MW-3 and MW-6, on the northeast corner of the site <br /> n <br /> PROPOSED SCOPE OF WORK <br /> Smith Environmental proposes the following scope of work to evaluate potential groundwater <br /> contamination at the subject site <br /> Installation of Two Groundwater Wells and Three Vapor Wells <br /> This task includes mobilization to the site, advancing two soil borings off-site and completing <br /> them as groundwater monitoring wells, and then advancing three soil borings on-site and <br /> completing them as vapor wells The proposed locations of the groundwater and vapor wells are <br /> shown on Figure 2 <br /> The two off-site borings will be advanced to depths of 40 feet below ound surface gs and <br /> gr (bgs), <br /> the three on-site borings will be advanced to depths of 30 feet bgs using 8-inch O D hollow stem <br /> augers Drilling will be conducted by Spectrum Exploration, Inc , a State-licensed (C57) drilling <br /> company A field geologist will be present to log all drill cuttings and soil samples Descriptions <br /> of soil types encountered, sample collection intervals, and well construction details will be <br /> recorded on boringlwell logs Soil samples will be collected at five foot intervals and up to two <br /> samples from each boring will be submitted for laboratory analysis of total petroleum <br /> hydrocarbons as gasoline (TPHg) and benzene, toluene, ethylbenzene, and xylenes (BTEX) <br /> Selected soil samples will be sent using chain-of-custody record to a State-certified laboratory for <br /> analysis of TPHg and BTEX. The two off-site bonngs will be completed as groundwater <br /> monitoring wells with screened intervals from approximately 25 to 40 feet bgs, and the three on- <br /> site borings will be completed as vapor wells with screened intervals from approximately 10 to 30 <br /> feet bgs The wells will be constructed of 2-inch inside diameter PVC well screen and casing To <br /> protect the integrity of the wells, locking, water-tight well plugs will be installed on each well, and <br /> water-tight, traffic rated, wellheads labeled "monitoring well" wiII be concreted over each well <br /> All drill cuttings will be drummed and stored on-site pending laboratory results <br />. 111'94373%rcpwukwp0496&= 2 <br /> • <br /> SMl"H <br />