Laserfiche WebLink
J9 Our total estimated budget for the proposed activities is has not increased nor decreased from the <br /> original proposal amount of 521,464 The additional work to be performed consists of labor and <br /> materials for the meeting with the client and PHS/EHD, preparing a workplan addendum, <br /> installing and developing a second sparge well, and conducting a second air sparge test. The <br /> work that was postponed consists of the installation, development, and sampling of two off-site <br /> groundwater monitonng wells. The attached estimated budget summarizes the cost for the <br /> proposed work and includes only a change in scope from the original proposal. Any additional <br /> work performed that is not described in the proposal or estimated budget will be treated as a <br /> separate phase of work and may require a separate proposal and estimated budget <br /> D <br /> If you have any questions regarding this proposal or nerd additional information please call our <br /> office at (209) 579-222I. <br /> Yours Very Truly, <br /> Smith Environmental Technologies Corporation <br /> q- 14-D,1-4 <br /> William Madison <br /> Geologist <br /> Jeanne Homsey, P E. <br /> California Registered Civil Engineer C47410 <br /> Attachments <br /> -*VPQL%N'90679 R.dac <br /> • <br /> s�H <br />