Laserfiche WebLink
ESTIMATED BUDGET <br /> FOR WELL INSTALLATION, PELOT TESTING AND <br /> CORRECTIVE ACTION PLAN PREPARATION AT <br /> TflIENANN'S SERVICE <br /> 106 West Second Street <br /> Ripon, California <br /> (Page 1 of 2) <br /> Installation of Vapor Extraction Wells and S arQe Wells <br /> n <br /> Task 1: Workplan Preparation, Meeting, Permitting and Scheduling <br /> o Labor $ 1,522 <br /> o Permit Fees (2 sites) 205 <br /> Task I Total: S1,727 <br /> Task 2: Installation of Three Vapor Wells and Two Sparge Wells <br /> a Labor $ 1,596 <br /> o Equipment/NUeage 120 <br /> o Subcontractor (driller) 6,486 <br /> a Laboratory Analysis (10 soil for TPHglBTEX) 575 <br /> Task 2 Total: $ 8,777 <br /> Task 3: Sparge Well Development <br /> o Labor S 462 <br /> o Equipmenv?vMeage 193 <br /> o Laboratory Analysis (2 water for TPHg/BTEX) 115 <br /> Task 3 Total: S770 <br /> • <br /> -\PmPQaAP90679R � � <br />