My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009745
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SECOND
>
106
>
3500 - Local Oversight Program
>
PR0545680
>
ARCHIVED REPORTS_XR0009745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 3:08:25 PM
Creation date
5/20/2020 2:37:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009745
RECORD_ID
PR0545680
PE
3528
FACILITY_ID
FA0005535
FACILITY_NAME
THIEMANS SERVICE
STREET_NUMBER
106
STREET_NAME
SECOND
STREET_TYPE
ST
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
106 SECOND ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATED BUDGET <br />• FOR WELL INSTALLATION, PILOT TESTING AND <br /> CORRECTIVE ACTION PLAN PREPARATION AT <br /> 'I MANN'S SERVICE <br /> 106 West Second Street <br /> Ripon, California <br /> (Page 2 of 2) <br /> Pilot Testin4 <br /> Task 4: Workplan Preparation and Scheduling <br /> o Labor $ 773 <br /> Task 4 Total: S773 <br /> Task 5: Vapor Extraction Pilot Tests (3 wells) <br /> o Labor S844 <br /> o Equip ment/NU eage 721 <br /> o Laboratory Analysis (5 air for TPHglBTEX� 475 <br /> Task 5 Total. 32,040 <br /> Task 6: Air Sparge Pilot Tests (2 wells) <br /> o Labor (perform air sparge test) 1,750 <br /> o EquipmenvMleage (perform air sparge test) 924 <br /> o laboratory Analysis (12 water and 8 air for TPHg/BTE7') 2_3.1.6 <br /> Task 6 Total: $4,990 <br /> Corrective Action Plan Preparation <br /> Task 7: Corrective Action Plan Preparation <br /> o Labor S2,393 <br /> Task 7 Total $2,393 <br /> TOTAL ESTItii 'IATED BUDGET: $21,470 <br /> VrkPF0PaftAP90679R&c SNRH <br />
The URL can be used to link to this page
Your browser does not support the video tag.