Laserfiche WebLink
ESTIMATED BUDGET <br />• FOR WELL INSTALLATION, PILOT TESTING AND <br /> CORRECTIVE ACTION PLAN PREPARATION AT <br /> 'I MANN'S SERVICE <br /> 106 West Second Street <br /> Ripon, California <br /> (Page 2 of 2) <br /> Pilot Testin4 <br /> Task 4: Workplan Preparation and Scheduling <br /> o Labor $ 773 <br /> Task 4 Total: S773 <br /> Task 5: Vapor Extraction Pilot Tests (3 wells) <br /> o Labor S844 <br /> o Equip ment/NU eage 721 <br /> o Laboratory Analysis (5 air for TPHglBTEX� 475 <br /> Task 5 Total. 32,040 <br /> Task 6: Air Sparge Pilot Tests (2 wells) <br /> o Labor (perform air sparge test) 1,750 <br /> o EquipmenvMleage (perform air sparge test) 924 <br /> o laboratory Analysis (12 water and 8 air for TPHg/BTE7') 2_3.1.6 <br /> Task 6 Total: $4,990 <br /> Corrective Action Plan Preparation <br /> Task 7: Corrective Action Plan Preparation <br /> o Labor S2,393 <br /> Task 7 Total $2,393 <br /> TOTAL ESTItii 'IATED BUDGET: $21,470 <br /> VrkPF0PaftAP90679R&c SNRH <br />