My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SECTION
>
5458
>
3500 - Local Oversight Program
>
PR0545682
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 3:01:14 PM
Creation date
5/20/2020 2:58:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545682
PE
3528
FACILITY_ID
FA0003669
FACILITY_NAME
GEORGE B LAGORIO FARMS
STREET_NUMBER
5458
STREET_NAME
SECTION
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
17330001
CURRENT_STATUS
02
SITE_LOCATION
5458 SECTION AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06 December 2001 <br /> AGE-NC Project No_ 99-0605 <br /> Page 4 of 6 <br /> 3.4. WELL COMPLETION <br /> As directed by the PHS-EIID, the soil boring will be completed as a soil vapor extraction well. The <br /> well will be installed within the boring with a screened interval From IS feet to 43 feet bsg. <br /> Construction details and procedures are presented in Section 4.2. <br /> 3.5. SOIL VAPOR EXTRACTION PILOT TEST <br /> AGF will conduct an eight hour soil vapor extraction pilot test on the finished well to assess the <br /> extractable contaminant mass and to evaluate SVE as a remedial option at the site. Procedures for <br /> the SVE test are given in Section 4.4. <br /> AGE will evaluate the analytical data from the test and prepare a site assessment report, closure <br /> report , or if necessary a corrective action plan for remediation alternatives for addressing MTBE in <br /> soil at the site. <br /> 3.6. REPORT PREPARATION <br /> i;pon completion of field work and receipt of the final laboratory results, a report will be prepared <br /> presenting the findings of the investigation. The report will include a description of the work <br /> performed and results of the sampling and analysis. Conclusions and applicable recommendations <br /> will be included in the report. The report will be in a format acceptable to the PHS--.1-.HD and the <br /> CVRWQCB, and will be reviewed and signed by a California Registered Geologist. <br /> 4.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative working under the supervision of <br /> a California Registered Geologist. Procedures for soil sampling, ground water sampling, equipment <br /> decontamination and sample shipment are outlined below. <br /> 4.1. SOIL SAMPLING PROCEDURES <br /> The soil boring will be advanced using hollow-stem auger drilling techniques. Relatively undisturbed <br /> soil samples will be collected in the boring using a California modified split-spoon sampler fitted <br /> with 2-inch diameter, 6-inch long brass sleeves. Upon removal from the sampler, the sample sleeves <br /> will be separated with a clean knife. The exposed ends of the second sleeve will be covered with <br /> Teflon sheets. capped and sealed with tape. Each soil sample will be labeled with boring location, <br /> -tdvareced(:eoLiivirnnmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.