My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009781
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEVENTH
>
15615
>
3500 - Local Oversight Program
>
PR0545683
>
ARCHIVED REPORTS_XR0009781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 4:10:07 PM
Creation date
5/20/2020 3:30:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009781
RECORD_ID
PR0545683
PE
3528
FACILITY_ID
FA0005408
FACILITY_NAME
LANGSTON ARCO*
STREET_NUMBER
15615
Direction
E
STREET_NAME
SEVENTH
STREET_TYPE
ST
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
15615 E SEVENTH ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF Environmental Consultants, Inc. <br /> Health & Safety Plan for Langston's Market, <br /> Lathrop, California <br /> 1.0 Health and Safety tY Plan <br /> WHF Environmental Consultants, Inc has adopted the following health and safety procedures for <br /> Iworking with organic vapors and hq_uid contaminants encountered during drilling and excavation <br /> of subsurface soil Z he purpose of this program is to provide health and safety precautions for the <br />' initial and subsequent site visits until the nature and magnitude of the contaminants have been <br /> defined <br /> 1.1 Personnel Responsibilities <br /> All personnel assigned or involved w.th the remedial investigation or Site clean-lips will <br /> have an assigned responsibility The outlined responsibilities will establish standards for <br /> personnel protective wear, safety procedures and provide for emergency actr.)ns which <br /> could anse during project operations <br /> 12 Project Manager(P!I) <br /> The Project Manager directs all pi c,evt opt -rations Project Manager (PM), in cooperation <br /> with the Pioject Safeq Officer (PSO;r, nas d,.- primary tesponsibiky for ensuring that the <br /> safety plan is read, sigi ed, -n4 fiizi, un ' -.btood by all employees an oitsLde _n essa,is <br /> allowed around of witlun designated wc,i"ig pcnmeteis of the Job site <br /> In cooperation with the PSO, he is responsible for ensuring that at all times during project <br /> operations, all employees adhere strictly to the Health and Safety Plan <br />' 1.3 Project Safety Officer (PSO) <br /> The PSO shall direct and ensure that all employees comply with the Health and Safety <br /> Plan The PSO has the primary responsibility for <br /> I Assuring that appropriate personnel protective equipment is available and properly <br /> utilized by all on-site personnel <br /> 2 Assuring that personnel are aware of the provisions of this plan, are instructed in <br /> the work practices necessary to ensure safety, and in planned procedures for <br /> dealing with emergencies <br />
The URL can be used to link to this page
Your browser does not support the video tag.