My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010176
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEVENTH
>
15615
>
3500 - Local Oversight Program
>
PR0545683
>
ARCHIVED REPORTS_XR0010176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 4:04:49 PM
Creation date
5/20/2020 3:45:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010176
RECORD_ID
PR0545683
PE
3528
FACILITY_ID
FA0005408
FACILITY_NAME
LANGSTON ARCO*
STREET_NUMBER
15615
Direction
E
STREET_NAME
SEVENTH
STREET_TYPE
ST
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
15615 E SEVENTH ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 14 August 2001 <br /> AGE-NC Project No 98-0511 <br /> Page 2 of 7 <br /> Complete background information and details of previous investigations at the site is included in the <br /> report titled Interim Secondary Source Removal and Monitoring Well Replacement,dated 05 October <br /> 1995 and various quarterly reports prepared by AGE and WHY, Inc <br /> 3.0. SCOPE OF WORK <br /> AGE proposes to advance one off-site pilot soil boring to a depth of 28 feet bsg to collect soil <br /> samples and install a ground water monitoring well, the proposed location of the soil boring is <br /> presented on Figure 2 The scope of work for ground water monitoring well installation activities <br /> will include of the following tasks <br /> • Permitting and pre-field work activities, <br /> • Soil sample collection and analysis, <br /> • Monitonng well installation and development, <br /> • QuarterIy ground water monitoring program, and <br /> • • Report preparation <br /> 3 1 PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> Applicable site assessment and encroachment permits will be obtained from the San Joaquin County <br /> Environmental Health Department(EHD)and City of Lathrop,respectively An update to the health <br /> and safety plan presently on-file will be prepared in accordance with Occupational Safety and Health <br /> Guidance Manual for Hazardous Waste Site Activities (National Institute for Occupational Safety <br /> and Health Administration, U S Coast Guard and U S Environmental Protection Agency, 1985) <br /> Prior to mobilization, the proposed monitoring well Iocations will be clearly marked and a utility <br /> clearance obtained through Underground Service Alert The EHD and City of Lathrop will be <br /> notified 48 hours prior to conducting investigation activities <br /> 32 SOIL SAMPLE COLLECTION AND ANALYSIS <br /> The pilot boring will be advanced to a depth of 28 feet below surface grade(bsg) Soil samples will <br /> be collected from the soil boring at a minimum of five-foot intervals Procedures for advancement <br /> of the pilot boring and soil sampling are presented in Section 4 1 <br /> • <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.