Laserfiche WebLink
Smith TechnoloSITE SAFETY PLAN <br /> yy <br /> FACILITY BACKGROUND <br /> In October 1988, one 1,000-gallon unleaded gasoline underground storage tank (UST) and <br /> all associated piping and dispensing equipment was removed and disposed of. Laboratory <br /> analysis of soil samples collected from beneath the former UST location indicated the <br /> presence of detectable concentrations total petroleum hydrocarbons. After the tank was <br /> removed, the area of the former tank was backfilled. <br /> WORKPLAN <br /> Task One: <br /> Supervise the installation of three soil borings to depths of approximately 20 feet. <br /> Two soil samples and one groundwater sample will be collected from each boring <br /> from areas which exhibit physical indications of contamination. Samples will be <br /> analyzed for BTEX and MTBE (EPA Method 8020), TPHg (EPA Method 8015 <br /> Modified), and total lead. <br /> PAGE <br />