My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1013
>
3500 - Local Oversight Program
>
PR0545685
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 9:24:49 AM
Creation date
5/21/2020 9:23:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545685
PE
3528
FACILITY_ID
FA0006081
FACILITY_NAME
PATTERN STEEL CO
STREET_NUMBER
1013
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1013 SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L WHF ENVIRONMENTAL CONSULTANTS <br /> INC. <br /> 4ft./ Health & Safety Plan <br /> L <br /> 1.0 HEALTHAND SAFETYPLAN <br /> L <br /> 1NHF Environmental Consultants, Inc. has adopted the following health and safety <br /> procedures for working with organic vapors and liquid contaminants encountered <br /> L during drilling and excavation of subsurface soil. The purpose of this program is to <br /> provide health and safety precautions for the initial and subsequent site visits until the <br /> Lnature and magnitude of the contaminants have been defined. <br /> 1.1 Personnel Responsibilities <br /> All personnel assigned or involved with the remedial investigation or site clean- <br /> Lups will have an assigned responsibility. The outlined responsibilities will <br /> establish standards for personnel protective wear, safety procedures and provide <br /> _ for emergency actions which could arise during project operations. <br /> 1.2 Project Manager (PM) <br /> L The Project Manager direr r <br /> � g is all project operations. Project Manager (PM), in <br /> cooperation with the Project Safety Officer (PSO), has the primary <br /> responsibility for ensuring that the safety plan is read, signed, and fully <br /> understood by all employees and outside persons allowed around or within <br /> designated working perimeters of the job site. <br /> In cooperation with the PSO, he is responsible for ensuring that at all times <br /> during project operations, all employees adhere strictly to the Health and Safety <br /> L Pian. <br /> L1.3 Project Safety Officer (PSO) <br /> The PSO shall direct and ensure that all employees comply with the Health and <br /> Safety Plan. The PSO has the primary responsibility for: <br /> 1. Assuring that appropriate personnel protective equipment is available and <br /> properly utilized by all on-site personnel. <br /> L <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.