My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1282
>
2900 - Site Mitigation Program
>
PR0545687
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 9:37:59 AM
Creation date
5/21/2020 9:35:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545687
PE
3528
FACILITY_ID
FA0003759
FACILITY_NAME
ST&E Roundhouse
STREET_NUMBER
1282
STREET_NAME
SHAW
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
14327016
CURRENT_STATUS
02
SITE_LOCATION
1282 Shaw Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. WORK ZONES AND SECURITY MEASURES <br /> To facilitate a minimum exposure to dangerous toxic vapors and/or physical hazards,only <br /> authorized persons will be,allowed on the job site. Work zones will be defined by Consultant <br /> staff who will also be responsible for maintaining security within these zones. Only the minimum <br /> number of personnel necessary for the UST investigation will be.present in the work zone. <br /> 5. DECONTAMINATION AND DISPOSAL <br /> General decontamination procedures will remove contaminants that may <br /> accumulate on workers and equipment during Site activities and will prevent <br /> contaminants from migrating from the Site. <br /> Decontamination involves the orderly and controlled removal of contaminants. <br /> Standardcontamination control methods and decontamination sequences are <br /> presented in this section. All Site personnel.should minimize contact with <br /> contaminants in order to limit the need for extensive decontamination. <br /> Contamination control methods;include using PPE when appropriate [disposable � <br /> coveralls (Tyvek or equivalent), gloves (disposable liner,neoprene or nitrile 1 <br /> outer), shoe or boot covers; equipment covers(plastic bags or sheets)!; and <br /> avoiding direct contact with the contaminated material and surfaces where <br /> possible. <br /> 5.1 Personnel Decontamination <br /> Preliminary personnel decontamination will be done in the Support Zone. The F <br /> following is a list 01 the equipment that may be necessary for decontaminating <br /> personnel, and the procedures that should be followed. <br /> Equipment: <br /> 1. Waste containers <br /> 2. Pressure washer and water tank <br /> 3. Brushes <br /> 4. Detergent <br /> 5. Plastic sheeting <br /> 6. Paper towels <br /> Msin\DlEnvironmcnL.I\\ST$1W.rkplan\W.,kplan l 1192007.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.