My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:46:36 AM
Creation date
5/21/2020 12:49:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Overfill Protection Testing Testing Procedure <br /> c. Print the Tank Inventory Report . <br /> d . Test the relay assigned to the external Overfill alarm (if present) to insure the Overfill alarm works . <br /> 1 . If the Overfill alarm does not sound , repair the device before continuing testing . <br /> 3 . Testing <br /> a. Turn off power to the console . <br /> b . Disconnect the probe from the field wiring and remove it from the riser. <br /> 1 . If you are testing more than one tank remove all the probes from their risers. <br /> c. Lay the probe safely on the ground and reattach the field wiring . <br /> d . Position the water float at the bottom of the probe and the product float 25% up from the bottom of the <br /> probe. <br /> e. Power the console back on . <br /> f. Simulate a delivery as follows : <br /> 1 . Move the float towards the top of the probe at a rate of 1 -2" per ten seconds. <br /> 2 . Continue moving the float to the top of the probe at a rate of 1 -2 " per ten seconds for the next 50 <br /> seconds, the probe is now in delivery mode. <br /> 3 . Slide the float at a moderate speed to the top of the probe. Note to not slam the float against the head <br /> of the probe, this can damage the float. <br /> g . Once the float reaches the overfill level the Overfill alarm , including external Overfill alarm (if present) , will <br /> sound . <br /> h . Silence the Overfill alarm on the TLS and external Overfill alarm (if present) by acknowledging it . <br /> i . Move the float down to the bottom of the probe. The TLS will clear the Overfill alarm once the delivery delay <br /> time is complete . <br /> j . Repeat 3f 3i for the other probes. <br /> 4. Test Completion <br /> a. Print out the delivery report for all tanks tested. <br /> b . Power off the console . <br /> c . Replace the probes back into the tank ; before inserting into riser, ensure that the floats are positioned at the <br /> bottom of the probe. <br /> d. Power on the console. <br /> e. If the console is running BIR enter a manual adjustment for the amount of the delivery. <br /> f. If the site is not running BIR give the delivery report to the store manager so they can log the delivery as <br /> part of the overfill testing , <br /> i <br /> i <br /> p,' Alli' � E 2019 <br /> 25 <br /> i <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.