Page 2 of 3 <br /> I'm back in the office today after one full week camped out at a site. I never made it back to the <br /> office last week and never saw this email from you. <br /> Regarding the permiting of the NON NPL site, YES...a permit is needed. <br /> we file our sites by ADDRESS. please provide it so I can direct you to the inspector assigned <br /> to the site. <br /> generally, boring permits are needed PER parcel and PER drilling contractor. If the property is <br /> NOT under the ownership of the applicant of the permit, an ACCESS AGREEMENT is needed <br /> from the landowner before we can issue the permit. IF the drilling in on a public right of way, <br /> then an ENCROACHMENT PERMIT is needed from the municipality with responsibility for the <br /> ROW. Some agencies also require a REVOCABLE PERMIT if a well/traffic box is set. <br /> A Master File Record (MFR) is to be provided with the permit application. I've attached one <br /> here for you along with a UNIT IV- Site Mitigation Permit Application and its page two, the <br /> "Licensed Contractor Declaration" (LCD). We issue permits to Licensed DRILLING <br /> contractors, not consultants. Please have the driller fill out and PDF, fax, or mail the LCD to us. <br /> permits are issued to drillers under a lead agency work plan approval. Please provide the <br /> workplan and lead agency approval letter to the EHD so we may ensure our Well Standard <br /> requirements for grouting are being met. <br /> permits for wells are $366 per application plus $122 per well. permits for borings placed with <br /> NO casing left in the ground overnight are $366 per application plus $122. <br /> these prices are PER parcel/ per driller. if you drill on TWO parcels, each permit application <br /> needs its own fee. mulitiple drilling contracters? then multiple applications and fees. <br /> Owner-builder Declaration form is NOT needed for UNIT IV-SITE MITIGATION use. you have <br /> the wrong form. <br /> send us the work plan, the lead agency work plan approval letter and fees with the forms I've <br /> attached here. <br /> From: Phillips, Hollis [mailto:Hollis.Phillips@arcadis-us.com] <br /> Sent: Friday, October 15, 2010 12:31 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Stockton well destruction and permitting question <br /> Mike: <br /> You going to respond to this or should I just guess O <br /> From: Phillips, Hollis <br /> Sent: Wednesday, October 13, 2010 7:28 PM <br /> To: 'Mike Infurna [EH]' <br /> Cc: Neary, Leigh <br /> Subject: Stockton well destruction and permitting question <br /> Mike: <br /> Just an FYI that we finally got that well out of the ground and the borehole grouted up at the M&B site. A <br /> 10/27/2010 <br />