Laserfiche WebLink
i <br /> L 1 <br /> Page 1 of 2 <br /> John Yoakum [EH] <br /> From: Kalbassi, Sheida [Sheida.Kai bassi@arcadis-us.com] <br /> Sent: Monday, October 29, 2012 8:37 AM <br /> To: John Yoakum [EH]; Cervantes, Roberto@Waterboards <br /> Subject: RE: Chevron 35-2515 upcoming site assessment(401 North San Jose street Stockton) <br /> Hi, <br /> I am emailing to let you know our additional site assessment field work which had been postponed due <br /> to access issues, is going to start next Monday(11/05) at 8AM.We anticipate this field work(please see <br /> details below)will take us the entire week of November 05. <br /> 1 am going to be the point of contact for this site so please let me know when you are available to stop <br /> by for an inspection while we are out there. <br /> My cell-phone number: 310-849-3746. <br /> Please let me know if you have any questions. <br /> Regards, <br /> From: Kalbassi, Sheida <br /> Sent: Monday, October 01, 2012 8:53 AM <br /> To: ']Yoakum@sjcehd.com'; 'Cervantes, Roberto@Waterboards' <br /> Subject: Chevron 35-2515 upcoming site assessment(401 North San Jose street Stockton) <br /> Hi all, <br /> Per our previous conversation couple weeks ago about the upcoming site assessment at 401 North San <br /> Jose Street,Stockton,CA, I am emailing to let you know the soil boring and groundwater monitoring well <br /> installation activities are scheduled to be started next week(week of October 8th) <br /> I have a brief summary of our field activities with the anticipated order they will be conducted attached <br /> here for your reference. <br /> 1.) MW-6—hoping to complete by the end of the first day, Monday the 8th <br /> • 2 "casing, total depth of 20' <br /> • Screened from 10-20,0.010-inch slotted screen (Sch 40 PVC) <br /> • Monterey 2/12 sand from 8-20, 2 ft of chips then grout to 1'bgs—finish with concrete <br /> 2.) MW-5 <br /> • 4" casing,total depth 20' <br /> • Screened from 10-20,0.010-inch slotted screen (Sch 40 PVC) <br /> • Monterey 2/12 sand from 8-20, 2 ft of chips then grout to 1'bgs—finish with concrete <br /> 3.) MW-7 <br /> • 4" casing,total depth 25' <br /> • Screened from 10-25', 0.010-inch slotted screen (Sch 40 PVC) <br /> • Monterey 2/12 sand from 8-25', 2 ft of chips then grout to 1'bgs—finish with concrete <br /> 10/29/2012 <br />