My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOSE
>
401
>
2900 - Site Mitigation Program
>
PR0518340
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 3:36:45 PM
Creation date
5/21/2020 3:04:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518340
PE
2960
FACILITY_ID
FA0013845
FACILITY_NAME
CHEVRON FACILITY #35-2515
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOSE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13526016
CURRENT_STATUS
01
SITE_LOCATION
401 N SAN JOSE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> L 1 <br /> Page 1 of 2 <br /> John Yoakum [EH] <br /> From: Kalbassi, Sheida [Sheida.Kai bassi@arcadis-us.com] <br /> Sent: Monday, October 29, 2012 8:37 AM <br /> To: John Yoakum [EH]; Cervantes, Roberto@Waterboards <br /> Subject: RE: Chevron 35-2515 upcoming site assessment(401 North San Jose street Stockton) <br /> Hi, <br /> I am emailing to let you know our additional site assessment field work which had been postponed due <br /> to access issues, is going to start next Monday(11/05) at 8AM.We anticipate this field work(please see <br /> details below)will take us the entire week of November 05. <br /> 1 am going to be the point of contact for this site so please let me know when you are available to stop <br /> by for an inspection while we are out there. <br /> My cell-phone number: 310-849-3746. <br /> Please let me know if you have any questions. <br /> Regards, <br /> From: Kalbassi, Sheida <br /> Sent: Monday, October 01, 2012 8:53 AM <br /> To: ']Yoakum@sjcehd.com'; 'Cervantes, Roberto@Waterboards' <br /> Subject: Chevron 35-2515 upcoming site assessment(401 North San Jose street Stockton) <br /> Hi all, <br /> Per our previous conversation couple weeks ago about the upcoming site assessment at 401 North San <br /> Jose Street,Stockton,CA, I am emailing to let you know the soil boring and groundwater monitoring well <br /> installation activities are scheduled to be started next week(week of October 8th) <br /> I have a brief summary of our field activities with the anticipated order they will be conducted attached <br /> here for your reference. <br /> 1.) MW-6—hoping to complete by the end of the first day, Monday the 8th <br /> • 2 "casing, total depth of 20' <br /> • Screened from 10-20,0.010-inch slotted screen (Sch 40 PVC) <br /> • Monterey 2/12 sand from 8-20, 2 ft of chips then grout to 1'bgs—finish with concrete <br /> 2.) MW-5 <br /> • 4" casing,total depth 20' <br /> • Screened from 10-20,0.010-inch slotted screen (Sch 40 PVC) <br /> • Monterey 2/12 sand from 8-20, 2 ft of chips then grout to 1'bgs—finish with concrete <br /> 3.) MW-7 <br /> • 4" casing,total depth 25' <br /> • Screened from 10-25', 0.010-inch slotted screen (Sch 40 PVC) <br /> • Monterey 2/12 sand from 8-25', 2 ft of chips then grout to 1'bgs—finish with concrete <br /> 10/29/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.