My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOSE
>
401
>
2900 - Site Mitigation Program
>
PR0518340
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 3:36:45 PM
Creation date
5/21/2020 3:04:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518340
PE
2960
FACILITY_ID
FA0013845
FACILITY_NAME
CHEVRON FACILITY #35-2515
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOSE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13526016
CURRENT_STATUS
01
SITE_LOCATION
401 N SAN JOSE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> 4.)SB-2 <br /> • Total depth 35' <br /> • Collect grab GW w/a 1" pre-packed well—screened from 34-35 <br /> • Remove casing, backfill with grout to 1'to 6" bgs and patch with concrete and black dye to match <br /> surrounding <br /> 5.) SB-1 <br /> • Total depth 35' <br /> • Collect grab GW w/a 1" pre-packed well—screened from 34-35 <br /> • Remove casing, backfill with grout to 1'to 6" bgs and patch with concrete and black dye to match <br /> surrounding <br /> 6.)SB-3A(concrete coring needed) <br /> • Total depth 20' <br /> • Collect grab GW w/a 1" pre-packed well—screened from 19-20 <br /> • Remove casing, backfill with grout to 1'to 6" bgs and patch with concrete <br /> 7.)SB-36(concrete coring needed) <br /> • Total depth 35' <br /> • Collect grab GW w/a 1" pre-packed well—screened from 34-35 <br /> • Remove casing, backfill with grout to 1'to 6" bgs and patch with concrete <br /> We are expecting the field work to take us 5 days to complete. Please let me know what day and time works the <br /> best for you to schedule the inspection.Attached is my cell-phone number as a point of contact in the field. <br /> Should you have any questions or concerns, please contact me. <br /> Regards, <br /> Sheida Kalbassi I Environmental Engineer) Sheida.Kalbassi(o,arcadis-us.com <br /> ARCADIS U.S., Inc. 12999 Oak Road, Suite 300,Walnut Creek, CA,94597 <br /> T.925.296.7850 I M.310.849.3746 <br /> www.arcadis-us.com <br /> ARCADIS, Imagine the result <br /> Please consider the environment before printing this email. <br /> NOTICE: This e-mail and any files transmitted with it are the property of ARCADIS U.S., Inc. and its affiliates. All <br /> rights, including without limitation copyright, are reserved. The proprietary information contained in this e-mail <br /> message, and any files transmitted with it, is intended for the use of the recipient(s) named above. If the reader of <br /> this e-mail is not the intended recipient, you are hereby notified that you have received this e-mail in error and that <br /> any review, distribution or copying of this e-mail or any files transmitted with it is strictly prohibited. If you have <br /> received this e-mail in error, please notify the sender immediately and delete the original message and any files <br /> transmitted. The unauthorized use of this e-mail or any files transmitted with it is prohibited and disclaimed by <br /> ARCADIS U.S., Inc. and its affiliates. Nothing herein is intended to constitute the offering or performance of <br /> services where otherwise restricted by law. <br /> 10/29/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.