My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOSE
>
401
>
2900 - Site Mitigation Program
>
PR0518340
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 3:25:06 PM
Creation date
5/21/2020 3:05:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518340
PE
2960
FACILITY_ID
FA0013845
FACILITY_NAME
CHEVRON FACILITY #35-2515
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOSE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13526016
CURRENT_STATUS
01
SITE_LOCATION
401 N SAN JOSE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Navone(N.San Jose) Page 2 <br /> Soil&Groundwater Investigation <br /> Project No.879.2 <br /> March 29,2001 <br /> selected from either the capillary fringe or from a shallower depth if contamination is <br /> detectable in field observations. <br /> Groundwater Grab Sampling <br /> Upon reaching the capillary fringe in each borehole, a hydropunch-type sampling tool will <br /> be advanced into the groundwater and a groundwater sample will be collected from each <br /> borehole. The samples are collected from a mini stainless steel bailer and gently transferred <br /> into VOA vials (a ball check valve and tubing will be used if the bailer does not collect <br /> sufficient water to sample). The VOA vial is capped, inverted, tapped, and checked for <br /> headspace bubbles. The vial will be labeled and placed on ice for shipment to the <br /> laboratory. Clean surgical gloves are worn at all times in handling of the sample and <br /> sampling equipment. The bailer is cleaned between uses with an Alconox solution and <br /> water rinse. <br /> Groundwater is expected to be approximately 15 feet below ground surface (bgs). If <br /> sufficient groundwater is not present at 15 feet bgs, the drill rods will be advanced an <br /> additional five feet to 20 feet bgs. It should be noted that drilling deeper would increase <br /> project costs according to the additional depth. <br /> 2.2 Soil Laboratory Analyses <br /> Soil samples will be submitted to a California State Certified Laboratory and analyzed for: <br /> • benzene, toluene, ethylbenzene and xylene (BTEX by EPA method 602) <br /> • total petroleum hydrocarbons as gasoline (TPH-G by EPA method 8015m) <br /> • total extractable petroleum hydrocarbons as diesel (TEPH-D by EPA method <br /> 3540/8015m) <br /> etection imrts: <br /> Soil µg Kg1,000 5,000 <br /> A Chain of Custody will be completed for all samples collected and tracked to ensure <br /> sample integrity. <br /> 2.3 Groundwater Sample Analyses <br /> The samples will be submitted to a California State Certified Laboratory and analyzed for: <br /> • benzene, toluene, ethylbenzene and xylene (BTEX by EPA method 602) <br /> • total petroleum hydrocarbons as gasoline (TPH-G by EPA method 5030/8015m) <br /> • total extractable petroleum hydrocarbons as diesel (TEPH-D by EPA method <br /> 3540/8015m) <br /> DetectionLimits: <br /> Water µg <br /> A Chain of Custody will be completed for all samples collected and tracked to ensure <br /> sample integrity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.