My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOSE
>
401
>
2900 - Site Mitigation Program
>
PR0518340
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 3:25:06 PM
Creation date
5/21/2020 3:05:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518340
PE
2960
FACILITY_ID
FA0013845
FACILITY_NAME
CHEVRON FACILITY #35-2515
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOSE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13526016
CURRENT_STATUS
01
SITE_LOCATION
401 N SAN JOSE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Navone(N.San Jose) Page 3 <br /> Soil&Groundwater Investigation <br /> Project No.879.2 <br /> March 29,2001 <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork within 30 days of receipt of work <br /> plan approval. The information gathered during this phase of work will be presented in a <br /> report, which will include a summary of the geology as well as the results of sample <br /> analyses. Dr. Ray Kablanow, a registered professional geologist, will supervise the project. <br /> Copies of the report will be forwarded to both the appropriate County agency. <br /> 4.0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc. will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> �Dti� <br /> Eric L. Price <br /> Geologist <br /> Raynold I. Kablanow II, Ph.D. <br /> California Registered Geologist#5234 <br /> Certified Hydrogeologist#442 <br />
The URL can be used to link to this page
Your browser does not support the video tag.