Laserfiche WebLink
Navone(N.San Jose) Page 3 <br /> Soil&Groundwater Investigation <br /> Project No.879.2 <br /> March 29,2001 <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork within 30 days of receipt of work <br /> plan approval. The information gathered during this phase of work will be presented in a <br /> report, which will include a summary of the geology as well as the results of sample <br /> analyses. Dr. Ray Kablanow, a registered professional geologist, will supervise the project. <br /> Copies of the report will be forwarded to both the appropriate County agency. <br /> 4.0 SIGNATURES & CERTIFICATION <br /> Geological Technics Inc. will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> �Dti� <br /> Eric L. Price <br /> Geologist <br /> Raynold I. Kablanow II, Ph.D. <br /> California Registered Geologist#5234 <br /> Certified Hydrogeologist#442 <br />