Laserfiche WebLink
DEVELOPMENT COMMITTEE MEMORANDUM <br /> ZR-91-13 & RV-88-2 <br /> PAGE TWO <br /> C. Commercial structure at entrance can be <br /> started during this phase and completed by <br /> Phase III. <br /> 2 . Phase II shall be completed by January 21, 1996 and <br /> includes the following: <br /> a. The development of up to 200 recreational <br /> vehicle camp sites. <br /> 3 . Phase III shall be completed by January 21, 1999 <br /> and includes the following: <br /> a. The development of up to 200 recreational <br /> vehicle camp sites. <br /> b. Develop linear houseboat dock adjacent to <br /> campground. <br /> C. Develop house boat and boat works facilities. <br /> d. Construct club house. <br /> e. Commercial structure at entrance is to be <br /> completed during this phase. <br /> 4 . Phase IV shall be completed by January 21, 2002 and <br /> includes the following: <br /> a. The development of up to 144 recreational <br /> vehicle camp sites. <br /> B. The linear houseboat dock, shall be constructed in a <br /> manner that it will leave the tule marsh intact. Details <br /> of dock construction shall be submitted to the Community <br /> Development Department for State and local review and <br /> approval. <br /> C. Individual recreational vehicle sites shall be a minimum <br /> of one thousand five hundred (1500) square feet and a <br /> maximum of one thousand nine hundred (1900) square feet <br /> in area. (Section 9-2304 (b) ) <br /> D. The widths of recreational vehicle sites shall average at <br /> least 35 feet and have at least fifteen (15) feet of <br /> frontage on a driveway. (Section 9-2304 (c) ) <br />