My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 1:05:51 PM
Creation date
5/27/2020 12:20:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
x <br /> `1 <br /> SECTION 3 AWARD OF CONTRACT <br /> The award of contract, if made, shall be on the basis of the sum total of all items in <br /> Schedule A and the sum total of both items in Schedule B for only one quarter. The <br /> contract shall include provision for up to four added quarters, on a contingency basis, <br /> but the contract shall be awarded on the basis of Schedule A plus Schedule B, as if for <br /> one additional quarter. <br /> SECTION 4 WORK SCHEDULE <br /> Section 4.1 Scope of Work <br /> The work herein provided for consists, in general of Soil and Groundwater Remediation <br /> System Installation, Operation and Maintenance, and Site Closure. <br /> The work, in brief, consists of the following: <br /> 1. Preparation of a workplan and securing permits for the installation of three new <br /> shallow vapor wells and three new air sparge wells. Installation of three new <br /> shallow vapor wells and three new air sparge wells with a two-foot by two-foot well <br /> vault over each well, a ball valve at each well head to control airflow in or out, and a <br /> sampling port for monitoring purposes. <br /> 2. Securing an Authority to Construct from the San Joaquin Valley Unified Air <br /> Pollution Control District and building permits from the City of Stockton. <br /> 3. Installation of a soil vapor extraction system (VES) and an air sparging (AS) <br /> system including completion of wellhead piping connections; pressure testing of <br /> lines; installation of the remediation enclosure; connection to electrical service and <br /> installation; and plumbing of all process equipment related to the VES and <br /> groundwater AS system. <br /> 4. Remediation system startup, testing, and reporting. <br /> 5. Obtaining a Permit to Operate from the San Joaquin Valley Unified Air Pollution <br /> Control District. <br /> 6. Remediation system operation and maintenance including site inspections, <br /> monitoring and adjusting of system parameters, sampling, sample analysis, field <br /> monitoring, and reporting for one year. <br /> 7. Quarterly monitoring of groundwater wells, sample analysis, and reporting for six <br /> quarters. Monitoring will be performed for four quarters during operation and for <br /> two quarters post-operation. See Section 10.10. <br /> 8. Preparation of a workplan, obtaining soil boring permits and advancing <br /> confirmation soil borings in preparation for closure. <br /> 9. Preparation of a closure report. <br /> 10. System decommissioning, equipment removal, preparation of a workplan, <br /> obtaining well destruction permits and well destruction activities. <br /> 11. And such other items and details shown and/or specified shall be furnished and <br /> installed and/or constructed which are required for proper and complete <br /> operation of the soil vapor extraction and air sparge remediation system. <br /> SP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.