Laserfiche WebLink
x <br /> `1 <br /> SECTION 3 AWARD OF CONTRACT <br /> The award of contract, if made, shall be on the basis of the sum total of all items in <br /> Schedule A and the sum total of both items in Schedule B for only one quarter. The <br /> contract shall include provision for up to four added quarters, on a contingency basis, <br /> but the contract shall be awarded on the basis of Schedule A plus Schedule B, as if for <br /> one additional quarter. <br /> SECTION 4 WORK SCHEDULE <br /> Section 4.1 Scope of Work <br /> The work herein provided for consists, in general of Soil and Groundwater Remediation <br /> System Installation, Operation and Maintenance, and Site Closure. <br /> The work, in brief, consists of the following: <br /> 1. Preparation of a workplan and securing permits for the installation of three new <br /> shallow vapor wells and three new air sparge wells. Installation of three new <br /> shallow vapor wells and three new air sparge wells with a two-foot by two-foot well <br /> vault over each well, a ball valve at each well head to control airflow in or out, and a <br /> sampling port for monitoring purposes. <br /> 2. Securing an Authority to Construct from the San Joaquin Valley Unified Air <br /> Pollution Control District and building permits from the City of Stockton. <br /> 3. Installation of a soil vapor extraction system (VES) and an air sparging (AS) <br /> system including completion of wellhead piping connections; pressure testing of <br /> lines; installation of the remediation enclosure; connection to electrical service and <br /> installation; and plumbing of all process equipment related to the VES and <br /> groundwater AS system. <br /> 4. Remediation system startup, testing, and reporting. <br /> 5. Obtaining a Permit to Operate from the San Joaquin Valley Unified Air Pollution <br /> Control District. <br /> 6. Remediation system operation and maintenance including site inspections, <br /> monitoring and adjusting of system parameters, sampling, sample analysis, field <br /> monitoring, and reporting for one year. <br /> 7. Quarterly monitoring of groundwater wells, sample analysis, and reporting for six <br /> quarters. Monitoring will be performed for four quarters during operation and for <br /> two quarters post-operation. See Section 10.10. <br /> 8. Preparation of a workplan, obtaining soil boring permits and advancing <br /> confirmation soil borings in preparation for closure. <br /> 9. Preparation of a closure report. <br /> 10. System decommissioning, equipment removal, preparation of a workplan, <br /> obtaining well destruction permits and well destruction activities. <br /> 11. And such other items and details shown and/or specified shall be furnished and <br /> installed and/or constructed which are required for proper and complete <br /> operation of the soil vapor extraction and air sparge remediation system. <br /> SP2 <br />