My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 1:05:51 PM
Creation date
5/27/2020 12:20:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 7.3 Quantities <br /> The following estimate of the quantities are approximate and are intended as a basis for <br /> the comparison of bids. Schedule A, the main schedule, includes all expected project <br /> activities. Schedule B is a contingency schedule. The contract shall be awarded on the <br /> basis of Schedule A plus Schedule B, as if for one additional quarter. <br /> Schedule A: Main Schedule <br /> ITEM DESCRIPTION QUANTITY UNITS <br /> 1 INSTALLATION OF VAPOR EXTRACTION AND AIR <br /> SPARGE WELLS (includes workplan, permits, and LS <br /> installation of three (3) vapor extraction and (3) air -- <br /> sparge wells) <br /> 2 INSTALLATION OF VAPOR EXTRACTION AND AIR -- <br /> SPARGE SYSTEM (includes all necessary components, LS <br /> equipment, and procedures) <br /> 3 SYSTEM STARTUP AND SOURCE TESTING (includes <br /> all testing, inspection and reporting necessary to bring -- LS <br /> system to regular operation schedule) <br /> 4 OPERATION, MAINTENANCE, COMPLIANCE <br /> MONITORING, AND REPORTING (includes site <br /> inspection, monitoring and adjustment of system -- LS <br /> parameters, sampling, sample analysis, and field <br /> monitoring as necessary and required) <br /> 5 QUARTERLY GROUNDWATER MONITORING AND <br /> REPORTING — SIX QUARTERS (includes sampling and -- LS <br /> sample analysis) <br /> 6 CONFIRMATION SOIL BORINGS (includes workplan, <br /> permits, four (4) soil borings, and coordination with SJ -- LS <br /> PHS/EHD) <br /> 7 CLOSURE REPORT -- LS <br /> 8 SYSTEM DECOMMISSIONING, REMOVAL, AND WELL <br /> DESTRUCTION (includes workplan, permits, destruction -- LS <br /> of 18 wells, and resurfacing of broken pavement) <br /> Schedule B: Contingency Schedule <br /> ITEM DESCRIPTION QUANTITY UNITS <br /> 1 CONTINUED QUARTERLY OPERATION, <br /> MAINTENANCE, COMPLIANCE MONITORING, AND max of 4 LS <br /> REPORTING (as in Item 4 — Schedule A) <br /> 2 CONTINUED QUARTERLY GROUNDWATER max of 4 LS <br /> MONITORING (as in Item 5 — Schedule A) <br /> SP6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.