My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012625
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
ARCHIVED REPORTS_XR0012625
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 1:31:17 PM
Creation date
5/27/2020 12:25:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012625
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F' A <br /> i <br /> i <br /> i � <br /> P , <br /> Develop a comprehensive monitoring and maintenance <br /> program to track contaminant migration and pumping <br /> system performance. <br /> WORK PLAN <br /> M 1. Install four additional monitoring wells across the <br /> study area to provide more detailed information on <br /> subsurface conditions which effect contaminants location <br /> and migration. The wells will be installed to a <br /> depth of 50 feet and soil samples obtained at five foot <br /> intervals in accordance with Groundwater Technology, <br /> Inc. 's Standard operating Procedures SOP 13 (See <br /> Appendix I) . The proposed monitoring well locations <br /> are plotted on Figure 2. <br /> 2. Design and install three pumping wells to initiate <br /> control over further plume migration and provide for <br /> .a <br /> remedial cleanups of the free product and dissolved <br /> contamination. Figure 2 shows the approximate <br /> location of the proposed pumping wells. Design <br /> specifications of the various components for the well <br /> installation are described below. <br /> A. Pumping well 1 would be located on the eastern <br /> W edge of the Tang Fat Enterprises property and <br /> Pumping well 2 located on property owned by the <br /> Tomato Growers Association. Both will be of <br /> similar design and construction. Well instal- <br /> lation and soil sampling procedures would be <br /> similar to the previously mentioned monitoring <br /> wells. However, to prevent possible penetration <br /> of a confining layer between .water bearing units <br /> (aauiclude) , the last 10 feet of the boring <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.