My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010286
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SONORA
>
110
>
3500 - Local Oversight Program
>
PR0545695
>
ARCHIVED REPORTS_XR0010286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 5:13:45 PM
Creation date
5/27/2020 4:45:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010286
RECORD_ID
PR0545695
PE
3528
FACILITY_ID
FA0003877
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #2
STREET_NUMBER
110
Direction
W
STREET_NAME
SONORA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13731025
CURRENT_STATUS
02
SITE_LOCATION
110 W SONORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-"NOMA <br /> Working To Restore Nature <br /> 6 4_ <br /> Task 4. EquipmenI Pr-Qgurement <br /> ' After engineering design is completed, permits have been obtained, and a contractor selected, <br /> RESNA will then provide the City of Stockton with a list of long-lead capital equipment (greater <br /> ' than 4 weeks) to be ordered. RESNA will order the equipment directly from the vendor <br /> ' C5 Task 5. Construction and Construction Inspgction <br /> ' Following approval of the FRP, obtaining City Building, Fire and Planning Department permits, <br /> City of Stockton, Municipal Utilities Department discharge permit, and SJVUAPCD air permit <br /> ' to construct, systems installation in accordance with the approved Plans and Specifications will <br /> be initiated Construction will include completion of wellhead piping connections; pressure <br /> ' testing of lines, construction of the remediation compound, connection of electrical service and <br /> installation; and plumbing of all process equipment (blower, pump, holding tank, LEL meter, <br /> and off-gas abatement system) related to the VES and groundwater remediation system <br /> 6 Task 6 Systems Startup and Opgration <br /> tThis section and the ensuing sections detail a monitonng plan to venfy the effectiveness of the <br /> ' proposed VES and groundwater remediation system at this site. <br /> ' 6.61 Systems Monitoring <br /> ' 6 6 1.1 System Monitoring - Vapor Extraction System <br /> ' After completion of system installation, operation of the proposed VES will be initiated in <br /> compliance with applicable regulatory agencies Startup procedures will include system <br /> ' monitoring, maintenance and sampling within the first 5 days of operation. Operation and <br /> 38004-8138009-8 FRP 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.