My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
749
>
3500 - Local Oversight Program
>
PR0545698
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 9:55:15 AM
Creation date
5/28/2020 9:47:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545698
PE
3528
FACILITY_ID
FA0009775
FACILITY_NAME
CONCRETE INC - STKN-STANISLAUS
STREET_NUMBER
749
Direction
S
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14723006
CURRENT_STATUS
02
SITE_LOCATION
749 S STANISLAUS ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
% <br /> the pipeline a distance of approximately QFC) feet. <br /> Adjustments in the scope of the trench excavation will be made <br /> if needed (see drawing #4) . <br /> L+ The total amount of soil excavated will be approximately <br /> 800 cubic yards. Every effort will be made to separate <br /> contaminated soil from the clean. Ulean soil will be stored <br /> -::-n the west side of the property and contaminated soil will be <br /> loaded into trucks and transported to Forward Inc. as it is <br /> being excavated. <br /> 7. Soil Sampling Soil sampling will be accomplished <br /> by retrieving material from the appropriate areas with the <br /> excavator bucket . Samples will be taken from the bucket by <br /> r„ WM. Hunter .and Associates at the direction est the WF'HEM410 <br /> represent it ive on site. All sampling and analyses will rol low <br /> LUFT guidelines and be transported by Wm. Hunter and Assoc. <br /> repreVentitive directly to Fruit vrowers Laboratories, located <br /> in Stockton, CA, under chain of custody. Samples will be <br /> tested for TPH--D and ESTE: R X using the approved methods. We <br /> propose to take seven (7) sidewall and three (C) bottom <br /> '-' <br /> samples from they excavation and eight (8) from the pipeline <br /> trench. Samples will be taken equidistant around the <br /> perimeter and along the length of the bottom car the excavation <br /> L. (see drawings #`, " & 4) . Locations of the samples may change <br /> at the direction of SJHS/EHD representitive on site. Erie <br /> total number of samples may be altered if conditions warrant a <br /> rr <br /> change. <br /> a. Temporary Fence . A temporary fence will be placed <br /> around the excavation r.nti1 backfilled. <br /> t. <br /> " . 8ackf i l l Backfilling will be done by <br /> Concrete Inc:. persone 1. Backfill material will be whichever <br /> is appropriate for the desired condition. <br /> 10. Werk Schedule Work can begin within 14 days gat <br /> SJPHS/EHD approval of this work plan. Sample analyses results <br /> should be ready for review within 2 weeks. <br /> Il. Health and Safety <br /> �.• Plan Attached. <br /> Respectfully submitted, <br /> JIM THORPE OIL, INC. <br /> d hm-r H—MART .CONST WCT I ON <br /> Richard Thor e <br /> President <br /> V <br />
The URL can be used to link to this page
Your browser does not support the video tag.