My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011955
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1252
>
3500 - Local Oversight Program
>
PR0545699
>
ARCHIVED REPORTS_XR0011955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 10:07:56 AM
Creation date
5/28/2020 9:55:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011955
RECORD_ID
PR0545699
PE
3528
FACILITY_ID
FA0010903
FACILITY_NAME
CSU STANISLAUS MULTI CAMPUS REGIONA
STREET_NUMBER
1252
Direction
N
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13921008
CURRENT_STATUS
02
SITE_LOCATION
1252 N STANISLAUS ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> { <br /> } <br /> Table D )tentized Cost Analysis for SVE and Groundwater Pump and Treat Alternative <br /> ITEM Units 'Rate Cost <br /> Preparatory Work <br /> i Work Plan preparation and approval 1 each $3,504 $3,500 <br /> Subcontract negotiations 20 hours 185 $1,700 <br /> Permit applications and fees(Well Permits, Waste Water Discharge <br /> Permit,and Air Permit) I site $2,000 $2,000 <br /> SVE and Pump and Treat Well Installation SUB'.TOTAL $7,200 <br /> jInstallation of SVE wells 5 each $3,000 $15,000 <br /> Installation of SVE piping I site $35,000 $35,000 <br /> Installation of three phase electrical I site $15,000 $15,000 <br /> Installation of pump and treat wells with pumps 2 each $5,000 $10,000 <br /> f Installation of pump and treat piping and associated equipment <br /> (Condor estimate) I site $20,000 $20,000 <br /> General Field Work 40 hours $75 $3,000 <br /> I <br /> SUBTOTAL $98,000 <br /> SVE Equipment Rental and Operation <br /> 50 SCFM Thermo Oxidizer(electric) 12 months $3,000 $36,000 <br /> Mobilization l each $750 c $750 <br /> Demobilization I each $750 ;>$756 <br /> Electric(Condor estimate) 12 months $1;500 $18,000 <br /> Operation and maintenance(Condor estimate) 12 months $1;200 $14,400 F <br /> SUBTOTAL $69,900 r <br /> Pump and Treat Equipment Operation <br /> Carbon canister replacement, I per month 12 months $3,000 $36,000 <br /> Electric(Condor estimate) 12 months $300 $3,600 F <br /> SUBTOTAL $39,600 <br /> Remediation Monitoring and Reporting <br /> System monitoring and maintenance 24 visits $300 $7,200 <br /> Sample analysis 60 samples $250 $15,000 <br /> Monthly reporting 12 reports $600 $7,200 <br /> Verification Soil Sample Collection, analysis, and reporting 1 site $4,000 $4,000 <br /> Final reporting 1 report $31500 $3,500 <br /> SUBTOTAL $36,900 ? <br /> Contingencies (10%) $25,160 <br /> Project supervision (10%) $27,680 <br /> TOTAL $304,440 <br /> r <br /> i <br /> PA3024 CSUS-Multi-Campus\Work PlanTroblem Assessment Work PlanUables C and D.doc <br /> y <br />
The URL can be used to link to this page
Your browser does not support the video tag.