Laserfiche WebLink
Soil Vapor Extraction and Air Sparge Feasibility Evaluation Work Plan <br /> University Park <br /> September 15,2004.- <br /> Page 8 <br /> 8.0 PROJECT SCHEDULE <br /> Upon approval of this work plan by the SJCEHD and approval,by the client to proceed, the installation of <br /> the SVE wells and AS wells can be completed within approximately four weeks. The SVE and AS pilot <br /> tests can be completed within approximately four weeks after installation of the wells. The turn-around time <br /> for laboratory analyses is approximately two weeks. A report can be submitted within three weeks ofreceipt <br /> of the laboratory analyses. If you need additional information or have any questions, please call Don <br /> Kresse at(2 09)234-0515.. <br /> i <br /> { Respectfully submitted, <br /> I' - <br /> CONDOR EARTH TECHNOLOGIES, INC. - <br /> t <br /> Casey Kipf Donald E. Kresse, R.G., C.Hg.,REA <br /> Staff Geologist Senior Environ drogeologist <br /> Gto <br /> I ; <br /> I a <br /> No.0804 4 <br /> OF C&I <br /> PA3000_prj13024 CSUS-Multi-Canipus1302481Reports\Work P1ansTeasibility Evaluation Work Plan.doc <br /> . 1 <br /> ilk CONDOR <br /> 4 J <br />